Most viewed |

160526 5326415 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, PWWY type PWWY 0001 type leader of forty well waggons built by Bradken NSW for SCT, loaded with a 48' SCT reefer SCTR 214 and a fresh looking 48' MFG1 type container SCF unit SCFU 414041 with SCT decals.
|
|

160526 5356415 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, ARFY type ARFY 2187 refrigerated van with the original style short side doors Fairfax (NZL) built fibreglass body that has been fitted to a Comeng Qld 1970 built RO type flat waggon that was in service with Commonwealth Railways and recoded though ROX - AQOX - AQOY - RQOY codes before conversion.
|
|

160527 5544415 viewsBlamey crossing loop at the 1692 km, SCT train 5PM9 operating from Perth to Melbourne, PBGY type covered van PBGY 0108 Multi-Freighter, one of eighty units built by Gemco WA, with Independent Brake signage.
|
|

160530 9087415 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, seen here arriving to take the loop behind EDI Downer built EMD model GT46C-ACe unit SCT 004 serial 97-1728 and SCT 006 with 66 waggons for 2479 tonnes and 1603 metres length.
|
|

160530 9215415 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PWXY type PWXY 0004 one of twelve well waggons built by CSR Meishan Rolling Stock Co of China for SCT in 2008, loaded with a 48' SCT reefer SCTR 326 and a 46' 6" MFRG type former Wilmot Freeze Haul reefer now with SCF SCFU 814028.
|
|

161109 1898415 viewsMoule, former BHP RSK type iron ore waggon, modified by G&W Port Lincoln to cart gypsum and coded RSG type, RSG 6, fitted with hungry boards and loaded with gypsum.
|
|

161109 1932415 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 12 with heavy patching of body, new walls and fitted with hungry boards loaded with gypsum.
|
|

161111 2505415 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQNY 32182 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic, carrying two AGR 20' tanks V0687 and V0688 containing sodium cyanide solution.
|
|

040815 164652415 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, side view.
|
|

050421 1142415 viewsGillam Siding backtrack, BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401, 94.9 km marking on the rail. 21st April 2005.
|
|

110411 09990415 viewsNelson Point, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
|
|

030404 125349415 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252. 4th April 2003.
|
|

170728 09895415 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. An empty train can be seen climbing the grade up through Emu. 28th July 2017. GeoData.
|
|

5947 001 Welshpool 1987Jan415 viewsWelshpool, Goninan workshops, freshly rebuilt and ready for delivery, Mt Newman Mining C36-7M locomotive 5506 serial 4839-01 / 87-071 sits on a road transport float awaiting delivery to Port Hedland, it was rebuilt using AE Goodwin built C636 ALCo 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
|
|

23879415 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. July 1993.
Jim Bisdee photo.
|
|

242-17415 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

190107 0429415 viewsParkeston, Mineral Resources Ltd builders plate of MHPY type iron ore waggon MHPY 00368 built by CSR Yangtze Co China in 2014 as a batch of 382 units.
|
|

190107 0448415 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0534415 viewsBinduli, Mineral Resources empty iron ore train 2034 with second unit Pacific National NR class loco NR 43 with serial 7250-07 / 97-245 a Goninan Broadmeadow NSW built GE model Cv40-9i model locomotive with 4000 horsepower originally built for the National Rail Corporation.
|
|

190107 0606415 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00012 built by CSR Yangtze Co China serial 2014/382-12 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
363 |  |
 |
 |
 |
 |
 |
 |
|