Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
160522_2179.jpg
160522 2179132 viewsParkeston, 6MP4 intermodal train, RQQY 7076 platform 5 of 5-pack articulated skel waggon set, 1 of 17 built by Qld Rail at Ipswich Workshops in 1995, 48' Pacific National curtainsider PNXC 5624.
160522_2185.jpg
160522 2185132 viewsParkeston, 6MP4 intermodal train, platform 1 of 5-pack RRGY 7130 5 pack articulated skel waggon set, originally built as RRBY by AN Rail at Islington Workshops SA 1996-97, 40' deck empty.
160522_2384.jpg
160522 2384132 viewsParkeston, 7MP7 priority service train, platform 4 of 5 on RRQY 7330 5-pack articulated skel waggon set built by Qiqihar Rollingstock Works China in 2005 for Pacific National, with a 48' container of the owner PNXL 4325.
160529_8763.jpg
160529 8763132 viewsParkeston, 6MP4 intermodal train with crew accommodation coach RZEY 4, built by South Australian Railways Islington Workshops as Purpawi in 1955 for use on The Overland, coded JRA 4, to West Coast Railway, converted to RZEY by Bluebird Rail Operations 2007.
160529_8774.jpg
160529 8774132 viewsParkeston, 6MP4 intermodal train, RRQY 7324 platform 2 of 5-pack articulated skel waggon set built by Qiqihar Rollingstock Works China in 2005 in a batch of twenty nine for Pacific National with a 46' RFRG type reefer ARLS 491.
160531_9836.jpg
160531 9836132 viewsBinduli, 3PM4 steel train, empty ROOX 2265, a Comeng Victoria built GOX from 1972, recoded to AOOX.
160531_9838.jpg
160531 9838132 viewsBinduli, 3PM4 steel train, RKCX 329, an old Victorian Railways Bendigo Workshops built ELX 329 from 1970, to VOBX, VOCX, VOFX then ROBX in 1994, to RKCX in 1995.
160531_9951.jpg
160531 9951132 viewsWest Kalgoorlie, 3PM4 steel train, empty container waggon RQSY 14972.
110710_7426_PD.jpg
110710 7426 PD132 viewsWest Kalgoorlie, AQAY 2273, this orphan waggon started life as a Comeng Vic built GOX type open waggon for Commonwealth Railways in 1970, then coded AOOX. Under AWR ownership is was reduced to this 3 TEU unit container skeletal waggon. Peter Donaghy image.
160523_2829.jpg
160523 2829132 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0010 Greater Freighter, one of thirty five units built by Gemco WA in 2005 with plain white doors.
160526_5297.jpg
160526 5297132 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, PBHY type covered van PBHY 0037 Greater Freighter, one of a second batch of thirty units built by Gemco WA without the Greater Freighter signage.
161111_2420.jpg
161111 2420132 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQWY 30377 originally built by Tomlinson Steel WA as WFX type in 1970 from a batch of 161 carrying three TEU with two being 22G1 type 20' containers RSSU 211680 and ZIMU 283192 and a 20' 25N8 type tanktainer VRHU 002607 for Vintage Road Haulage.
161112_3023.jpg
161112 3023132 viewsWest Kalgoorlie, following a loco and crew change loaded sulphur train 6029 continues onto Malcolm behind the final two Clyde Engineering EMD model GT46C Q class units Q 4019 (originally Q 319) serial 98-1472 and Q 4018 (originally Q 318) serial 98-1471 as it crosses Gateacre Rd.
060429_3741.jpg
060429 3741132 viewsFlash Butt yard, Pony re-laying waggon 6702 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.
050409_0387.jpg
050409 0387132 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
030404_082810.jpg
030404 082810132 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
030404_125017.jpg
030404 125017132 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252 and NR 37 serial 7250-06 / 97-239. 4th April 2003.
170729_0119.jpg
170729 0119132 viewsGreen Pool, as they cross the #6 bridge on the original Robe River line with their train snaking all the way back to Western Creek, General Electric built ES44DCi unit 8114 serial 59106 in original silver livery and operating in AutoHaul™ with later sister units 8120 and 8148 with a loaded train from Yandicoogina. 29th July 2017. GeoData.
170729_0191.jpg
170729 0191132 views109 km on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 drag upgrade. 29th July 2017. GeoData.
170730_0518.jpg
170730 0518132 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port with mid-train remote unit General Electric built ES44ACi unit RHA 1021 serial 64302 sandwiched within 224 waggons. 30th July 2017. GeoData.
16873 files on 844 page(s) 368

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional