Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
22668.jpg
22668455 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and some ALCo Hi-Ad trucks being overhauled. 20th July 1991.
Jim Bisdee photo.
240-30.jpg
240-30455 viewsSeven Mile, Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW unit 9470 serial 53455. This and sister units 9471 and 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
242-10.jpg
242-10455 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
190107_0523.jpg
190107 0523455 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0541.jpg
190107 0541455 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00206 built by CSR Yangtze Co China serial 2014/382-206 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0550.jpg
190107 0550455 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00101 built by CSR Yangtze Co China serial 2014/382-101 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0602.jpg
190107 0602455 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00265 built by CSR Yangtze Co China serial 2014/382-265 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0630.jpg
190107 0630455 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00347 built by CSR Yangtze Co China serial 2014/382-347 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0633.jpg
190107 0633455 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00177 built by CSR Yangtze Co China serial 2014/382-177 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
6989_001.jpg
6989 001455 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
110620_2273.jpg
110620 2273455 viewsChapman, FMG TK type fuel tank waggon TK 09 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
249-05.jpg
249-05455 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
172-23.jpg
172-23454 viewsBallarat East, semaphore signal post 3, looking west towards Ballarat, new electric colour light signal installed, baulks on the end of the former Eureka line, Ballarat East loco depot on the left, electric colour dwarf signal between mainlines.
108-35.jpg
108-35454 viewsKyabram station yard overview north end, looking south, tracks removed, station building at right.
115-06.jpg
115-06454 viewsHurstbridge, old stabling sidings being removed to make new stabling yard, new fencing, timber traction poles, crib crossing at right, Sumitomo excavator and workers.
115-13.jpg
115-13454 viewsSomerton signal box, LHS elevation view, shows stair case.
124-18.jpg
124-18454 viewsSunshine looking from the passenger lines across to the Independent Through Goods lines, signal post 71 at camera, disc and semaphore signal posts 31 and 31B for control of the Independent Trough Goods lines, 31B pulled off for down Adelaide broad gauge goods train to cross over the passenger lines, BL classes Clyde Engineering EMD model JT26C-2SS serial 83-1014 and BL 35 Clyde Engineering EMD model JT26C-2SS serial 83-1019 in AN livery, standard gauge Sunshine Loop to the left of train, Newport Loop Line and GEB sidings at far right.
126-04.jpg
126-04454 viewsTottenham yard, broad gauge Australian National BL class locos BL 29 Clyde Engineering EMD model JT26C-2SS serial 83-1013 and BL 31 serial 83-1015 lead up Adelaide goods train 9150 into Tottenham yard, standard gauge line on the left edge of image, looking towards Tottenham Yard, Melbourne skyline in background.
126-07.jpg
126-07454 viewsTottenham broad gauge train 9169 down goods to Adelaide via Cressy, brake testing at Tottenham 9.5 km, V/Line C classes C 503 Clyde Engineering EMD model GT26C serial 76-826, C 506 serial 76-829 and C 501 'George Brown' serial 76-824, trailing view.
126-29.jpg
126-29454 viewsWallan Loop, standard gauge rescue locos on the loop, V/Line Y class Y 102 Clyde Engineering EMD G6B serial 63-292, waiting to return to Melbourne.
19216 files on 961 page(s) 381

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional