Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
030404_125029.jpg
030404 12502982 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252 and NR 37 serial 7250-06 / 97-239. 4th April 2003.
170728_09782.jpg
170728 0978282 viewsGreen Pool on the Robe line at the 60.75 km original order and now aging General Electric built Dash 9-44CW model locomotive 7091 serial 47770 is operating in AutoHaul™ mode with a pair of GE ES44DCi units 8155 and 8165 both in the Rio Tinto stripe livery as they pass a tamper and regulator doing track work. 28th July 2017. GeoData.
170728_10030.jpg
170728 1003082 viewsHarding Siding, arriving around the large curve at the 46 km on the Robe line is General Electric built ES44DCi unit 8124 serial 59116 leading Dash 9-44CW unit 7094 and sister ES44DCi unit 8186 with a loaded train from Yandicoogina mine. 28th July 2017. GeoData.
170729_0119.jpg
170729 011982 viewsGreen Pool, as they cross the #6 bridge on the original Robe River line with their train snaking all the way back to Western Creek, General Electric built ES44DCi unit 8114 serial 59106 in original silver livery and operating in AutoHaul™ with later sister units 8120 and 8148 with a loaded train from Yandicoogina. 29th July 2017. GeoData.
070908_0594.jpg
070908 059482 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
170915_0715.jpg
170915 071582 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1005 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
190107_0444.jpg
190107 044482 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00355 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0453.jpg
190107 045382 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon married pair set MHPY 00363 and MHPY 00364 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0519.jpg
190107 051982 viewsBinduli, cab side view of Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014.
190107_0650.jpg
190107 065082 viewsWest Kalgoorlie, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi model locomotive sits on a rake of fuel waggons awaiting its' transfer run to Esperance on the overnight fuel train.
190107_0655.jpg
190107 065582 viewsWest Kalgoorlie with Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi on the combined empty fuel and hopper transfer to Esperance.
190109_1571.jpg
190109 157182 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00105 built by CSR Yangtze Co China serial 2014/382-105 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1594.jpg
190109 159482 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00176 built by CSR Yangtze Co China serial 2014/382-176 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
110620_2283.jpg
110620 228382 viewsChapman, FMG TK type fuel tank waggon TK 02 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
200914_7765.jpg
200914 776582 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
200914_7768.jpg
200914 776882 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by BHP 5502 serial C6096-7 built in July 1976, retired in 1994, donated to Society in November 1995. 14th September 2020.
210321_9303.jpg
210321 930382 viewsBoodarie on the 5 km curve loaded FMG slave ore waggon 5745 was built by CSR Yangtze with a prototype pressed lower panels and is joined to 6746. This pair is the same as 3005 - 4006. 21st March 2021.
172-29.jpg
172-2981 viewsBallarat East loco depot, turntable radial roads, V/Line broad gauge Y class Y 138 Clyde Engineering EMD model G6B serial 65-404, cab front shot.
179-36.jpg
179-3681 viewsGheringhap, track view looking east back towards Geelong with V/Line broad gauge G class G 521 Clyde Engineering EMD model JT26C-2SS serial 85-1234 locked away with down empty grain train 9121 in Siding A, semaphore signal post 2 is the down home for the mainline, the points and point indicator are set for in the reverse for Siding B.
180-27.jpg
180-2781 viewsWodonga loco depot fuel point, V/Line broad gauge X class X 34 Clyde Engineering EMD model G16C serial 66-487 and H class H 5 Clyde Engineering EMD model G18B serial 68-632 wait to run the Sunday evening up Albury slab steel train.
16104 files on 806 page(s) 384

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional