Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
170728_09782.jpg
170728 0978280 viewsGreen Pool on the Robe line at the 60.75 km original order and now aging General Electric built Dash 9-44CW model locomotive 7091 serial 47770 is operating in AutoHaul™ mode with a pair of GE ES44DCi units 8155 and 8165 both in the Rio Tinto stripe livery as they pass a tamper and regulator doing track work. 28th July 2017. GeoData.
170729_0065.jpg
170729 006580 viewsCape Lambert South yard, a loaded train heads towards car dumper 7 behind General Electric built Dash 9-44CW unit 7043 serial 57094 wearing Pilbara Iron livery with HI reporting marks and two General Electric built ES44DCi units 8153 and 8107. 29th July 2017. GeoData.
170730_0492.jpg
170730 049280 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 with 112 waggons, a mid-train unit and another 112 waggons. 30th July 2017. GeoData.
170730_0589.jpg
170730 058980 viewsIndee, at the 55 km on the BHP line a loaded train from Yandi is heading north behind mid-train unit Electro-Motive London Ontario built SD70ACe/LC unit 4338 'Pepper' with 4481. 30th July 2017. GeoData.
070908_0594.jpg
070908 059480 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
241-08.jpg
241-0880 viewsNelson Point, Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. June 2002.
190107_0438.jpg
190107 043880 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00363 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0555.jpg
190107 055580 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00202 built by CSR Yangtze Co China serial 2014/382-202 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1556.jpg
190109 155680 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with Mineral Resources own MRL class loco MRL 005 'Carina Flyer' with serial R-0113-05/14-508 a UGL Rail Broadmeadow NSW built GE model C44ACi model locomotive, one of 6 built in 2014.
190109_1562.jpg
190109 156280 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00174 built by CSR Yangtze Co China serial 2014/382-174 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1589.jpg
190109 158980 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00373 built by CSR Yangtze Co China serial 2014/382-373 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
150619_9094.jpg
150619 909480 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, grinding and driving cab unit. Filter and blower housings, water tank, electrical cabinet, grinding hood between bogies, shows bar connection between modules, and water tank and electrical cabinet on right hand unit.
150619_9147.jpg
150619 914780 viewsMooka, side section 2 of 5, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white, Mermec fitted a Tecnogamma system as part of a refurbishment.
200914_7785.jpg
200914 778580 viewsPilbara Railways Historical Society museum, former Cliffs Robe River Iron Associates RSD-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th September 2020.
200914_7816.jpg
200914 781680 viewsPilbara Railways Historical Society, four wheel waggon showing chopper coupler and chains of the this un braked rollingstock. 14th September 2020.
250-25.jpg
250-2580 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. 22nd October 2000.
250-30.jpg
250-3080 viewsCape Lambert yard in the Load Box is recently stored Robe River AE Goodwin built ALCo M636 unit 9415 serial G6060-6 from February 1973 and was an extension of the original order and delivered with cab side numbering of 86-14-1715 and number boards as 1715. The ducting on the hood is the air to air intercooler modifications. 22nd October 2000.
119-22.jpg
119-2279 viewsMaribyrnong River bridge, signal post 162, Australian National broad gauge locos BL class BL 29 Clyde Engineering EMD model JT26C-2SS serial 83-1013 and 700 class 703 AE Goodwin ALCo model DL500G serial G6059-1 working down Adelaide bound goods train 9145 across the river.
121-36.jpg
121-3679 viewsMaryvale, track view, looking towards Morwell, Hazelwood Siding on left.
170-21.jpg
170-2179 viewsBenalla,, rationalised yard view looking north, shows the once magnificent signal gantry and interlocking being stripped out of this once fully interlocked yard, with two signal boxes and a full roundhouse and waggon repair shops.
16103 files on 806 page(s) 393

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional