Most viewed |
170730 0518105 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port with mid-train remote unit General Electric built ES44ACi unit RHA 1021 serial 64302 sandwiched within 224 waggons. 30th July 2017. GeoData.
|
|
060723 7825105 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|
060723 7845105 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|
070908 0594105 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
|
|
23733105 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
|
|
23882105 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is being lifted up and prepped for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.
|
|
030416 095502105 viewsWirrida Siding, looking south towards Tarcoola from the north end of the loop, concrete interlocking hut with searchlight repeater signal, point indicator, communications tower in the distance on the left and train control 'pillbox' on the right. Located at the 641 km from the 0 datum at Coonamia and 137 km north of Tarcoola between Carnes and Manguri on the Tarcoola - Alice Springs line. GeoData location. 16th April 2003.
|
|
241-07105 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation, cab side view. June 2002.
|
|
241-11105 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|
190107 0436105 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00307 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0553105 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00298 built by CSR Yangtze Co China serial 2014/382-298 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0593105 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00273 built by CSR Yangtze Co China serial 2014/382-273 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0624105 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00044 built by CSR Yangtze Co China serial 2014/382-44 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 1651105 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00003 built by CSR Yangtze Co China serial 2014/382-3 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 1678105 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00192 built by CSR Yangtze Co China serial 2014/382-192 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
150619 9098105 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left end of 5000 litre water tank, 2500 litre water tank, electrical cabinet, blower fans and filter housing, 5000 litre fuel tank, grinding hood between bogies with spare grinding stones or wheels above bogie.
|
|
250-35105 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. 22nd October 2000.
|
|
119-22104 viewsMaribyrnong River bridge, signal post 162, Australian National broad gauge locos BL class BL 29 Clyde Engineering EMD model JT26C-2SS serial 83-1013 and 700 class 703 AE Goodwin ALCo model DL500G serial G6059-1 working down Adelaide bound goods train 9145 across the river.
|
|
172-28104 viewsBallarat East loco depot, turntable radial roads, V/Line broad gauge Y class Y 138 Clyde Engineering EMD model G6B serial 65-404.
|
|
127-29104 viewsDeer Park West, broad gauge Australian National BL class BL 33 Clyde Engineering EMD model JT26C-2SS serial 83-1017 leads a V/Line G class with another down Adelaide bound goods train, this time on the north line.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
397 | |
|
|
|
|
|
|
|