Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100731_3210.jpg
100731 321091 viewsBinduli, WN 501, pneumatic discharge nickel concentrate waggon, type leader of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
221-34.jpg
221-3491 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
191-23.jpg
191-2391 viewsWandong, O'Gradys Road grade crossing, near former Mathiesons Siding, Victorian Railways liveried B class B 65 Clyde Engineering EMD model ML2 serial ML2-6 leads an UP special sleeper discharge train as it discharges sleepers.
226-07.jpg
226-0791 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
226-10.jpg
226-1091 viewsRedmont, at the 202 km the mid-train trailing remote Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03/92-128. GeoData.
228-12.jpg
228-1291 viewsYandi Two mobile machine parking bay, a new water cart for Henry Walker, operator of the BHP owned mine, WC201 is based on a Caterpillar 777B truck chassis.
229-15.jpg
229-1591 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
151111_9536.jpg
151111 953691 viewsView north from Table Hill. The white dots are a reflection from the high tension powerline poles.
151111_9533.jpg
151111 953391 viewsView north from Table Hill, line curves around to pass through Lockyer Gap.
151111_9539.jpg
151111 953991 viewsAn empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units crossing Lake Poongkaliyarra.
151111_9573.jpg
151111 957391 viewsAn empty train is still struggling upgrade at the 98 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
234-17.jpg
234-1791 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 builders plate. Circa 1998.
238-07.jpg
238-0791 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
238-12.jpg
238-1291 viewsNelson Point, traction bogie or truck off ex-SP SD40T-2 loco 8335. Geodata .
238-17.jpg
238-1791 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
239-13.jpg
239-1391 viewsOverview of the Yandi One sizing plant looking north from above the middling crushers along CV4 (middle belt) to the screen house which houses six Jaques 'banana screens'. The feed bin and associated feed conveyors, travelling left and right can be clearly seen. The 'new side' is on the left and the 'old side' on the right. The feed along CV10 to the stockpile is obscured by the 'old side' structure and Sub-Station 3 can just be made out. GeoData.
060110_2184.jpg
060110 218491 viewsNear the 78 km, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
060110_2185.jpg
060110 218591 viewsNear the 78 km, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
060110_2187.jpg
060110 218791 viewsYeelanna, empty grain arriving to shunt off empty hoppers, behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965. Sent to the Eyre Peninsula in July 2004. Approx. location of image.
060110_2198.jpg
060110 219891 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 shunts a rake of waggons into the grain siding. Approx. location of image.
16347 files on 818 page(s) 399

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional