Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
5952_001.jpg
5952 001297 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
19797.jpg
19797297 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 1 end. Sept 2003.
Jim Bisdee photo.
171018_0959.jpg
171018 0959297 viewsTad Yard and Roy Hill's General Eclectic ES44ACi model unit RHA 1020 serial number 64301 idles away on the fuel train with tank waggons TA 1010 and TA 1003 which were built by China Southern Rail at their Zhuzhou works. This ES44ACi unit was built in February 2016 as Erie Pennsylvania, USA. 18th October 2017.
240-16.jpg
240-16297 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
190107_0490.jpg
190107 0490297 viewsParkeston, side view of Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014.
190107_0532.jpg
190107 0532297 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0558.jpg
190107 0558297 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00141 built by CSR Yangtze Co China serial 2014/382-141 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0595.jpg
190107 0595297 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00164 built by CSR Yangtze Co China serial 2014/382-164 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0603.jpg
190107 0603297 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00266 built by CSR Yangtze Co China serial 2014/382-266 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1625.jpg
190109 1625297 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00235 built by CSR Yangtze Co China serial 2014/382-235 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1674.jpg
190109 1674297 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00179 built by CSR Yangtze Co China serial 2014/382-179 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
110620_2272.jpg
110620 2272297 viewsChapman, FMG TK type fuel tank waggon TK 12 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as the final member of a order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
200914_7820.jpg
200914 7820297 viewsPilbara Railways Historical Society, three four wheel waggons from the Point Samson PWD. All the PWD stock was of 3' 6" gauge. 14th September 2020.
245-14.jpg
245-14297 viewsWudinna, empty grain train shunts a rake of waggons before backing them into the grain siding, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
130710_1015.jpg
130710 1015297 viewsParkeston, SCT train 3PG1, PBHY type covered van PBHY 0008 Greater Freighter, one of thirty five units built by Gemco WA in 2005 without the Greater Freighter signage.
180-27.jpg
180-27296 viewsWodonga loco depot fuel point, V/Line broad gauge X class X 34 Clyde Engineering EMD model G16C serial 66-487 and H class H 5 Clyde Engineering EMD model G18B serial 68-632 wait to run the Sunday evening up Albury slab steel train.
166-24.jpg
166-24296 viewsWallan, Wallan Loop, V/Line standard gauge X class locomotive X 37 Clyde Engineering EMD model G26C serial 70-700 tows damaged NSWSRA XPT power car XP 2007 'City of Albury' to Melbourne, August 28, 1991. XP 2007 was damaged at Henty on May 3.
168-21.jpg
168-21296 viewsWest Footscray, looking west toward Tottenham at broad gauge separation junction, V/Line standard gauge G class Co-Co locomotive G 518 Clyde Engineering EMD model JT26C-2SS serial 85-1231 leads the up Melbourne Express passenger service from Sydney.
107-35.jpg
107-35296 viewsMathoura, station yard overview, looking north, sleeper loading site, Ascom silos in the distance.
126-33.jpg
126-33296 viewsWallan Loop, standard gauge relief light locos on the loop, V/Line Clyde Engineering EMD G6B model Y classes Y 151 serial 67-571 and Y 102 serial 63-292 and G18B T class T 411 serial 68-627, waiting to return to Melbourne.
18856 files on 943 page(s) 405

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional