Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060111_2387.jpg
060111 238777 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060113_2547.jpg
060113 254777 viewsKevin, narrow gauge locos 1604, NJ 3 and 1601 take the mainline to Thevenard, having reversed train 6DD3 on the Kevin triangle as they prepare to load, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981. 13th January 2006.
060113_2577.jpg
060113 257777 viewsCeduna, or Denial Bay area, empty gypsum train 6DD5 blasts up hill at the 440 km, west of Carpenter Corner Rd with power from triple 1600/NJ class units 1604, NJ 3 and 1601. 1604 in Australian Railroad Group livery is a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4. Location approximation. 13th January 2006.
130708_0723.jpg
130708 072377 viewsCharra,
130708_0834.jpg
130708 083477 viewsMoule, crossing loop, 445.6 km.
100731_3197.jpg
100731 319777 viewsBinduli, WN 518, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
224-25.jpg
224-2577 viewsBing siding, the afternoon empty to Yandi waits in the loop as a loaded behind two Goninan rebuilt CM40-8M GE units rolls through on the mainline, 5642 'Wallareenya' serial 8281-07 / 92-131 leads sister unit 5637. GeoData.
226-06.jpg
226-0677 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
229-02.jpg
229-0277 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-12.jpg
229-1277 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.
229-15.jpg
229-1577 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
230-08.jpg
230-0877 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train behind CM40-8M units 5654 and 5637 crossing the YT 311.5 km grade crossing. Geodata -22.713725, 119.055762 .
151111_9552.jpg
151111 955277 viewsSide view of empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units at the 53 km.
235-00.jpg
235-0077 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new. The loadout operator is walking past the train.
235-15.jpg
235-1577 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 leads the afternoon 240 waggon train with second unit Goninan built CM39-8 unit 5630 'Zeus' as the exit the loadout tunnel, notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
236-17.jpg
236-1777 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
238-02.jpg
238-0277 viewsPort Hedland Harbour, bulk carrier Grande Solaris, call sign: 7JOW (IMO: 9254769) and built in 2003 by the Tsuneishi Tadotsu Factory, Tadotsu Japan is berthed at Finucane Island C Berth taking on iron ore. 1st November 2003. Geodata .
238-03.jpg
238-0377 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
238-08.jpg
238-0877 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
239-13.jpg
239-1377 viewsOverview of the Yandi One sizing plant looking north from above the middling crushers along CV4 (middle belt) to the screen house which houses six Jaques 'banana screens'. The feed bin and associated feed conveyors, travelling left and right can be clearly seen. The 'new side' is on the left and the 'old side' on the right. The feed along CV10 to the stockpile is obscured by the 'old side' structure and Sub-Station 3 can just be made out. GeoData.
16103 files on 806 page(s) 407

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional