Most viewed |
030404 125244101 viewsPort Augusta Spencer Junction yard, crew coach on Perth bound intermodal. 4th April 2003.
|
|
060723 7824101 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|
171018 0952101 viewsTad Yard and Roy Hill's General Eclectic ES44ACi model units RHA 1017 serial number 63828 and RHA 1015 serial number 63826 idle away in between duties. These ES44ACi units were built in September 2015 at Erie Pennsylvania, USA. 18th October 2017.
|
|
171018 0959101 viewsTad Yard and Roy Hill's General Eclectic ES44ACi model unit RHA 1020 serial number 64301 idles away on the fuel train with tank waggons TA 1010 and TA 1003 which were built by China Southern Rail at their Zhuzhou works. This ES44ACi unit was built in February 2016 as Erie Pennsylvania, USA. 18th October 2017.
|
|
241-01101 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|
190107 0439101 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00363 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0442101 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00334 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0446101 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon married pair set MHPY 00014 and MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0478101 viewsParkeston, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014 is pushed back along the loop to as the power consist of Pacific National NR 60 and NR 8 runs around the waggon rake while Aurizon Q 4006 looks on.
|
|
190107 0525101 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
|
|
190107 0565101 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00295 built by CSR Yangtze Co China serial 2014/382-295 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0633101 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00177 built by CSR Yangtze Co China serial 2014/382-177 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 1609101 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 1645101 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00075 built by CSR Yangtze Co China serial 2014/382-75 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 1666101 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00279 built by CSR Yangtze Co China serial 2014/382-279 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
070622 0224101 viewsMooka in the back track siding, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white.
|
|
080116 1381101 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
|
|
247-05101 viewsCape Lambert fuel point, Robe River Dash 8 power 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
|
|
247-20101 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
|
|
140601 4446101 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8039-2 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
419 | |
|
|
|
|
|
|
|