Most viewed |
130705 0516100 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|
060530 4927100 viewsParkeston, AHLY 0056 one of sixty five AHBY class ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line construction, now in limestone quarry products service.
|
|
100601 8469100 viewsWest Kalgoorlie, WN 515, pneumatic discharge nickel concentrate waggon, one of thirty units built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|
100601 8482100 viewsWest Kalgoorlie, WN 517, pneumatic discharge nickel concentrate waggon, one of thirty units built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|
100601 8487100 viewsWest Kalgoorlie, WN 534, pneumatic discharge nickel concentrate waggon, one of a further ten units built by WAGR Midland Workshops as WN type in 1975 for WMC.
|
|
100731 3199100 viewsBinduli, WN 536, pneumatic discharge nickel concentrate waggon, one of a further ten built by WAGR Midland Workshops as WN type in 1975 for WMC
|
|
100731 3200100 viewsBinduli, WNB 545, pneumatic discharge nickel concentrate waggon, one of six built by Bluebird Rail Services SA in 2010 for BHP Billiton.
|
|
191-23100 viewsWandong, O'Gradys Road grade crossing, near former Mathiesons Siding, Victorian Railways liveried B class B 65 Clyde Engineering EMD model ML2 serial ML2-6 leads an UP special sleeper discharge train as it discharges sleepers.
|
|
228-07100 viewsYandi Two mobile machine fuel point. A Caterpillar 16G road motor grader is receiving attention.
|
|
229-00100 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|
230-18100 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
151111 9548100 viewsSide view of empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units at the 53 km.
|
|
232-16100 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
234-17100 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 builders plate. Circa 1998.
|
|
236-04100 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144, view of drivers side of cab.
|
|
236-02100 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144.
|
|
239-29100 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near exit from primary jaw type crusher. GeoData.
|
|
239-32100 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133 with the Yandi Fines stockpile and feed conveyor and pedestal stacker visible.
|
|
060110 2172100 viewsCummins, empty grain train departing yard on the Penong mainline behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|
060110 2185100 viewsNear the 78 km, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
422 | |
|
|
|
|
|
|
|