Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
150619_9083.jpg
150619 908398 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, B end and bogie detail.
030404_082847.jpg
030404 08284798 viewsPort Germein, Perth bound steel and intermodal hurries through on the main, out of focus shot of new vehicles loaded on flat waggons. 4th April 2003.
030404_120343.jpg
030404 12034398 viewsStirling North, looking west to Port Augusta, line to Port Augusta power station is diverging left, the narrow gauge line for Pichi Richi Railway is on the far right.
170728_09833.jpg
170728 0983398 viewsWestern Creek - Emu area, an empty train from Dampier climbs the grade on approach to the Robe River line overpass behind original liveried General Electric built Dash 9-44CW units 7093 serial 47772 and 7081 with third unit a stablemate ES44DCi 8189, the blue lights on the cab of 7093 being illuminated as the train is operating in AutoHaul™ mode. 28th July 2017. GeoData.
170729_0065.jpg
170729 006598 viewsCape Lambert South yard, a loaded train heads towards car dumper 7 behind General Electric built Dash 9-44CW unit 7043 serial 57094 wearing Pilbara Iron livery with HI reporting marks and two General Electric built ES44DCi units 8153 and 8107. 29th July 2017. GeoData.
170729_0289.jpg
170729 028998 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.
060715_6949.jpg
060715 694998 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
060723_7763.jpg
060723 776398 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 23rd July 2006.
030415_155301.jpg
030415 15530198 viewsTarcoola, at the 504.5 km, looking west, removed points for No. 1 Water Road joining the Camp Train Road. Town is to the far north west, and the mainline is on the right. GeoData location. 15th April 2003.
241-10.jpg
241-1098 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. June 2002.
190107_0451.jpg
190107 045198 viewsParkeston, Mineral Resources Ltd inspection plate on bogie of MHPY type iron ore waggon MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units.
190107_0521.jpg
190107 052198 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0524.jpg
190107 052498 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0581.jpg
190107 058198 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00370 built by CSR Yangtze Co China serial 2014/382-370 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0591.jpg
190107 059198 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00375 built by CSR Yangtze Co China serial 2014/382-375 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0626.jpg
190107 062698 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00052 built by CSR Yangtze Co China serial 2014/382-52 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1556.jpg
190109 155698 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL 005 'Carina Flyer' with serial number R-0113-05/14-508 and is a UGL Rail Broadmeadow NSW built GE C44ACi model locomotive, one of six such units built for Mineral Resources in 2014.
190109_1574.jpg
190109 157498 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00248 built by CSR Yangtze Co China serial 2014/382-248 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1610.jpg
190109 161098 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1620.jpg
190109 162098 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00209 built by CSR Yangtze Co China serial 2014/382-209 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
16480 files on 824 page(s) 435

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional