Most viewed |

170730 0490197 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.
|
|

060715 6949197 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
|
|

060723 7764197 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 23rd July 2006.
|
|

030415 154424197 viewsTarcoola, at the 504.5 km, looking east along the Trans Australian Railway in the middle of the yard, the Central Australian Railway is on the left, loop on the right, east leg of triangle is just in view with the sidings running east behind the large tree and water tank. Tarcoola is the junction for the TAR and CAR railways situated 504 km from the 0 km datum at Coonamia. GeoData location. 15th April 2003.
|
|

242-15197 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

190107 0553197 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00298 built by CSR Yangtze Co China serial 2014/382-298 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0638197 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00167 built by CSR Yangtze Co China serial 2014/382-167 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0650197 viewsWest Kalgoorlie, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi model locomotive sits on a rake of fuel waggons awaiting its' transfer run to Esperance on the overnight fuel train.
|
|

190109 1561197 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00173 built by CSR Yangtze Co China serial 2014/382-173 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1591197 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00241 built by CSR Yangtze Co China serial 2014/382-241 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080116 1369197 viewsChapman Siding, view from the hand brake end with F type Interlock coupling and hand brake wheel arrangement, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 16th January 2008.
|
|

080304 2179197 viewsThomas Yard, down the rail welding end, side view of control waggon 2324, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-01197 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the siding on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. The original line or Mainline is the second from the camera, with the car dumper one Empty Car line closest, and what becomes the car dumper two Loaded Car line is third. 22nd May 2002.
|
|

249-33197 viewsLoaded Hamersley Iron ore waggon pair National Steel USA built 5126 and Nippon Sharyo Japan built 770. Approximate location. 18th December 1999.
|
|

WTT Mildura Diesel 1953 16-53197 viewsInauguration of Diesel-Electric Operation of Melbourne - Mildura
Monday 16th March 1953.
18 pages PDF download 9.7 MB.
|
|

132-28196 viewsCarwarp, yard overview, Ascom silo complex, ground bunker on the left, station platform remnants at left, points for grain siding.
|
|

148-25196 viewsWangaratta, Signal Bridge, Down Signal Posts 7, 8 and stripped 10 facing camera, Up Post 9 facing away. Signal Post 7 two arms and two discs, Top arm Home Signal 'A' to No.2 Road to Post 17, Bottom arm Calling-on Signal from 'A' to No. 2 Road towards Post 17. Left-hand Disc from 'A' to No. 4 or 5 Roads towards Post 19; or to No. 6 Road. Right-hand Disc from 'A' to No. 3 Road towards Post 17. Signal Post 8 two arms one disc, Top arm Home Signal from 'A' to No. 1 Road to Post 20, Bottom arm Calling-on Signal from 'A' to No. 2 Road towards Post 20. The Disc from 'A' to Carriage Dock. Stripped Disc Post 10 was from 'B' to No. 1 Road towards Post 20 and from 'B' to Carriage Dock.
|
|

148-31196 viewsWangaratta yard looking south from footbridge with Siding A going into dock with K crossing removed, signal post 20 pulled off, number 1, 2 and 3 Roads with the double compound points leading across to number 4 and 5 Roads, goods shed and platform slewing crane, Freight Gate awning and water tower, grain silos in the background.
|
|

148-35196 viewsWangaratta, old town water tower, opened in 1929 and was the main storage tank for many years. It is no longer in use, but provides a venue for abseilers.
|
|

148-37196 viewsVR 1967 book of signals Wangaratta page 3
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
435 |  |
 |
 |
 |
 |
 |
 |
|