221-27.jpg
221-2783 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
222-21.jpg
222-2183 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie brings an empty train to a stop with 7091 for a crew change.
222-25.jpg
222-2583 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
222-30.jpg
222-3083 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie powers away with an empty train with sister Dash 9-44CW unit 7091 serial 47770 following a crew change with a loaded train.
225-08.jpg
225-0883 viewsBing siding, General Electric AC6000 model unit 6073 serial 51065 built at GE Erie is the mid-train remote for the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
226-06.jpg
226-0683 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
227-08.jpg
227-0883 viewsNelson Point, view along the rear of A and B berths from Shiploader 2, salt pile on the left, then the under harbour tunnel portal, old reclaimers 3 and 4 with the crushing building in the distance, which has now been demolished, and the rear of Shiploader 1 on B berth. GeoData.
229-01.jpg
229-0183 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
231-03.jpg
231-0383 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 'Yawata' serial 8412-07 / 93-141, note the difference in the liveries, 50 is in the teal and marigold logo and logo on the hood while 52 has the silver logo on the front only and no logo on the hood. GeoData.
231-06.jpg
231-0683 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
232-01.jpg
232-0183 viewsYandi Two entry portal for the loadout tunnel with dust extraction pipes. February 1997. GeoData.
232-15.jpg
232-1583 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.
234-04.jpg
234-0483 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.
235-00.jpg
235-0083 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new. The loadout operator is walking past the train.
235-15.jpg
235-1583 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 leads the afternoon 240 waggon train with second unit Goninan built CM39-8 unit 5630 'Zeus' as the exit the loadout tunnel, notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
239-33.jpg
239-3383 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
060110_2171.jpg
060110 217183 viewsCummins, empty grain train departing yard on the Penong mainline behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
060110_2181.jpg
060110 218183 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
060110_2199.jpg
060110 219983 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 shunts a rake of waggons into the grain siding with the 5 ton crane also visible. Approx. location of image.
060110_2233.jpg
060110 223383 viewsKarkoo, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge and to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
16301 files on 816 page(s) 438

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional