Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100609_09987.jpg
100609 0998770 viewsMidland, AZDY 30728, one of about fourteen WBAX vans converted to AZDY type sodium cyanide container waggon, originally built by WAGR Midland Workshops as one of seventy five WV/X type covered vans in 1967-68, converted late 1988/9 to WQDF. Loaded here with two empty AGR sodium cyanide tanktainers SD 638 and SD 663.
100731_3241.jpg
100731 324170 viewsBinduli, AQHY 30106 with sulphuric acid tank CSA 0074, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
221-22.jpg
221-2270 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
222-21.jpg
222-2170 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie brings an empty train to a stop with 7091 for a crew change.
222-27.jpg
222-2770 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
222-31.jpg
222-3170 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.
224-27.jpg
224-2770 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
226-08.jpg
226-0870 viewsRedmont, 202 km with a loaded Yandi train speeding north towards the port behind a pair of CM40-8M locomotives with the distinctive flat top loading profile of the Yandi loadouts. GeoData.
226-09.jpg
226-0970 viewsRedmont, at the 202 km the mid-train remotes Goninan rebuild CM40-8M GE unit 5644 'Kangan' serial 8281-09/92-133 leads sister unit 5639. GeoData.
226-15.jpg
226-1570 viewsShaw North, 216.5 km, view looking south with the 700 metre radius curve around to the right and the departure signals with the repeater posts at the far left and far right of the image. GeoData.
226-14.jpg
226-1470 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
226-29.jpg
226-2970 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.
228-02.jpg
228-0270 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
228-13.jpg
228-1370 viewsYandi Two mobile machine fuel point. A Caterpillar 16G road motor grader is receiving attention.
230-12.jpg
230-1270 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. The pipe is for the dust extraction system. Geodata -22.718338, 119.039909 .
231-02.jpg
231-0270 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
232-19.jpg
232-1970 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.
233-01.jpg
233-0170 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
235-05.jpg
235-0570 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
235-12.jpg
235-1270 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
16103 files on 806 page(s) 447

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional