Most viewed |

157-21346 viewsKilmore East, Apex Quarry Siding, V/Line broad gauge locomotives N class N 471 'City of Benalla' Clyde Engineering EMD model JT22HC-2 serial 87-1200 and T class T 390 Clyde Engineering EMD model G8B serial 65-420 with train under the loading bins during loading operations.
|
|

160-26346 viewsShepparton, yard view of stabled broad gauge V/Line T class locomotives T 371 Clyde Engineering EMD model G8B serial 64-326 and T 385 serial 64-340 still in Victorian Railways blue and yellow livery, goods shed on the right, station platform and building on the left, T class T 393 serial 65-423 is behind T 385.
|
|

187-23346 viewsYeerongpilly locomotive depot, Freight Rail 82 class Clyde Engineering built EMD model JT42C unit 8227 serial 94-1334. GeoData.
|
|

190-31346 viewsMarinna, located at the 477.88 km on the NSW Main South line, view looking south with grain siding catch points at right, passive grade crossing and mainline crossover in the distance.
|
|

218-35346 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 idle away waiting their next loaded train to push out.
|
|

100731 03175346 viewsWOB type iron ore waggon WOB 31387 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 312 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, empty train arriving at Binduli Triangle, 31st July 2010.
|
|

030409 104458346 viewsWaddikee station located at the 218.3 km and opened in September 1921, yard overview with the rear waggons of a loaded grain train operating south to Cummins.
|
|

060108 2068346 viewsLock, grain train being loaded by former SAR 830 class unit 842, built by AE Goodwin ALCo model DL531 serial 84140 in 1962, originally on broad gauge, transferred to Eyre Peninsula in October 1987 and, 1204 and sister 851.
|
|

060109 2124346 viewsKyancutta, ASR 830 class unit 842, an AE Goodwin built ALCo DL531 model loco serial 84140 leads EMD unit 1204 due to air-conditioning trouble and sister ALCo 851 as they shunt empty grain waggons on the silo loop. 9th January 2006.
|
|

060111 2323346 viewsWarramboo, located at the 190.2 km and opened with the line in May 1913, with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 shunts empty grain waggons into the grain loop for loading. 11th January 2006.
|
|

060111 2346346 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
|
|

060111 2402346 viewsWudinna, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004, shunts through the yard.
|
|

060113 2438346 viewsThevenard, at the Gypsum Resources Australian (GRA) gypsum unloading site, 1604 leads a triple consist of Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. Friday 13th January 2006.
|
|

060113 2465346 viewsThevenard, narrow gauge loco 1604 departs the yard with empty train 6DD3, 1604 leads a triple consist of Clyde Engineering built EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 the original class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. 13th January 2006.
|
|

060113 2468346 viewsThevenard, narrow gauge loco 1604 departs the yard with empty train 6DD3, 1604 leads a triple consist of Clyde Engineering built EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 the original class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. 13th January 2006.
|
|

060113 2489346 viewsKevin, the triple NJ-1600 class combination of 1604, NJ 3 and 1601 pull the empty gypsum train 6DD3 along the Penong line prior to reversing around the triangle. 13th January 2006.
|
|

130703 0287346 viewsKaldow, HAN type bogie grain hopper waggon HAN 52, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0375346 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1514 recoded to 1204 in April 2004 and to the Eyre Peninsula in July 2004.
|
|

130705 0510346 viewsLock, the heavy fog has lifted and EMD 1200 class unit 1203 is leading the loading of a grain train on the grain loop road with two ALCo DL531 units 846 and 859.
|
|

130705 0522346 viewsLock, 1203, 846 and 859 shunt their loading grain train out of the siding onto the mainline. Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge in 2002 before being repainted and transferred to the Eyre Peninsula system in 2003. 5th of July 2013.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
448 |  |
 |
 |
 |
 |
 |
 |
|