Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
190109_1570.jpg
190109 157082 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00086 built by CSR Yangtze Co China serial 2014/382-86 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1569.jpg
190109 156982 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00085 built by CSR Yangtze Co China serial 2014/382-85 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1575.jpg
190109 157582 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00225 built by CSR Yangtze Co China serial 2014/382-225 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1578.jpg
190109 157882 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00042 built by CSR Yangtze Co China serial 2014/382-42 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1588.jpg
190109 158882 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00095 built by CSR Yangtze Co China serial 2014/382-95 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1606.jpg
190109 160682 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00311 built by CSR Yangtze Co China serial 2014/382-311 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1608.jpg
190109 160882 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1622.jpg
190109 162282 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00128 built by CSR Yangtze Co China serial 2014/382-128 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1623.jpg
190109 162382 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00145 built by CSR Yangtze Co China serial 2014/382-145 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1627.jpg
190109 162782 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00165 built by CSR Yangtze Co China serial 2014/382-165 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1649.jpg
190109 164982 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00016 built by CSR Yangtze Co China serial 2014/382-16 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1659.jpg
190109 165982 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00381 built by CSR Yangtze Co China serial 2014/382-381 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1660.jpg
190109 166082 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00382 built by CSR Yangtze Co China serial 2014/382-382 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1674.jpg
190109 167482 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00179 built by CSR Yangtze Co China serial 2014/382-179 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080116_1381.jpg
080116 138182 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
247-20.jpg
247-2082 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
174-23.jpg
174-2381 viewsAlbury, yard view from station dock area, NSWSRA standard gauge Red Terror liveried pair of 44 class 4456 AE Goodwin ALCo model DL500B serial 83746 and 4458 AE Goodwin ALCo model DL500B serial 83748 shunt the north with a Melbourne bound goods train.
178-22.jpg
178-2281 viewsBallarat East, track view looking towards Warrenheip with a down goods train on approach, the shot if off focus but the area is being re-signalled from mechanical to electric, with a new set of points to go in and a new electric light signal to replace the mechanical post No.3, Ballarat East loco depot is on the right.
168-21.jpg
168-2181 viewsWest Footscray, looking west toward Tottenham at broad gauge separation junction, V/Line standard gauge G class Co-Co locomotive G 518 Clyde Engineering EMD model JT26C-2SS serial 85-1231 leads the up Melbourne Express passenger service from Sydney.
133-27.jpg
133-2781 viewsGheringhap, V/Line broad gauge locos C class leader C 501 'George Brown' Clyde Engineering EMD model GT26C serial 76-824 leads C 506 serial 76-829 and X class X 45 'Edgar H Brownbill' Clyde Engineering EMD model G26C serial 75-792 with train 9169 down Adelaide goods, departing with a train order for Maroona, station overview, point rodding and signal wires, semaphore signal post 4 pulled off for the Cressy line, interlocking.
16347 files on 818 page(s) 452

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional