Most viewed |
040912 14214494 viewsNelson Point, Silver Star observation coach, 'Sundowner', 3/4 view of rear end, shows lighting arrangement, end of train markers. Originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|
050319 013894 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the steel train.
|
|
050412 073594 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
|
|
050518 209594 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 734.
|
|
051001 574194 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
|
|
060429 375094 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
|
|
050407 038294 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|
050409 041194 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of front trolley and tarp protecting windscreen. 9th April 2005.
|
|
050410 051894 viewsNelson Point yard hard stand area front view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|
050410 052194 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|
050412 082094 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|
050625 360194 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|
050625 366394 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|
080621 273194 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, close up of bogie and detail of A end.
|
|
080621 273294 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of B end with squeeze rollers and chutes raised.
|
|
110606 174994 viewsFlash Butt, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|
060723 776294 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 23rd July 2006.
|
|
030416 08385094 viewsCarnes Siding located at the 566.4 km on the Central Australian line from Tarcoola to Alice Springs. Looking south from the goods siding off the loop with deadend siding to loading ramp, communications tower at left. GeoData location. 16th April 2003.
|
|
190107 044894 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 045694 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon miss-matched married pair MHPY 00113 and MHPY 00270 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
458 | |
|
|
|
|
|
|
|