Most viewed |

227-25344 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
|
|

227-36344 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth.
|
|

228-24344 viewsYandi Two branch, trailing shot of the afternoon empty train mid-train remotes heading west near the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
|
|

229-13344 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
|
|

151111 9534344 viewsA view from Table Hill looking north-north west with a loaded train on the Lake Poongkaliyarra causeway and heading through Lockyer Gap bound for Cape Lambert.
|
|

150523 8209344 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034 with safety slogan 'Thank Safe + Work Safe = Go Home Safe', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

150523 8216344 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0032 with safety slogan 'Start with safety', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

231-08344 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

232-12344 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

232-25344 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|

060110 2211344 viewsOn the curve near the 85 km between Yeelanna and Karkoo, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 leads an empty grain train. Approx. location of image.
|
|

060110 2242344 viewsLock, grain train loading underway behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge and to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

160523 2790344 viewsParkeston, APNY 31156, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

160523 3292344 viewsWest Kalgoorlie, ATPF 571 fuel tank waggon is the type leader built by WAGR Midland Workshops in 1974 for Shell as WJP type 80.66 kL one compartment one dome, capacity of 80500 litres.
|
|

160524 3767344 viewsWest Kalgoorlie, 2PM6 intermodal train, RRAY 7232 platform 4 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, with a 40' K+S Freighters curtainsider KTL 401030.
|
|

160524 3771344 viewsWest Kalgoorlie, 2PM6 intermodal train, RQQY 7076 platform 3 of 5-pack articulated skel waggon set, 1 of 17 built by Qld Rail at Ipswich Workshops in 1995, 48' Linfox box DRC 511.
|
|

160525 4457344 viewsParkeston, 3PM7 priority service train, RRQY 8408 platform 5 of 5-pack articulated skel waggon, one of thirty four sets built by Qiqihar Rollingstock Works China in 2012, 48' deck with a Intermodal Solutions 48' box RCS 4832.
|
|

160525 4456344 viewsParkeston, 3PM7 priority service train, RRQY 8408 platform 4 of 5-pack articulated skel waggon, one of thirty four sets built by Qiqihar Rollingstock Works China in 2012, 48' deck with a Pacific National 48' curtainsider PNXM 4522.
|
|

160523 2982344 viewsParkeston, 7SP3 intermodal train, PQYY 7083 platform 2, PQYY type is a 5-pack articulated well waggon set built in September 1995 by AN Islington Workshops as one of a pair of RQYY for Boxcar/Cubico and recoded in the late '90s to PQYY. Loaded with a 40' 4EG1 type Sea2Rail container TSPD 408102[3].
|
|

160523 3002344 viewsParkeston, 7SP3 intermodal train, RRGY 7149 platform 1, the RRGY type is a 5-pack articulated skeletal container waggon, fifty were originally built by AN Rail Islington Workshops in 1996-97 as type RRBY, later rebuilt with 48' intermediate decks and recoded to RRGY. Loaded with a Pedemont 20' 2EG1 type box PHR 578 and a Royal Wolf 20' 25G1 type box RWTU 210266[2].
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
459 |  |
 |
 |
 |
 |
 |
 |
|