Most viewed |
![Filename=225-01.jpg
Filesize=295KiB
Dimensions=1280x843
Date added=Oct 28, 2015 225-01.jpg](albums/Pilbara/225/thumb_225-01.jpg)
225-0186 viewsWalla siding area, the East Turner River is in flood, flowing with the bridge at the 55.5 km in the background.
|
|
![Filename=225-10.jpg
Filesize=217KiB
Dimensions=839x1280
Date added=Oct 28, 2015 225-10.jpg](albums/Pilbara/225/thumb_225-10.jpg)
225-1086 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, CM40-8M light engine on approach. GeoData.
|
|
![Filename=226-06.jpg
Filesize=287KiB
Dimensions=1280x852
Date added=Nov 13, 2015 226-06.jpg](albums/Pilbara/226/thumb_226-06.jpg)
226-0686 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
|
|
![Filename=226-15.jpg
Filesize=321KiB
Dimensions=1280x846
Date added=Nov 13, 2015 226-15.jpg](albums/Pilbara/226/thumb_226-15.jpg)
226-1586 viewsShaw North, 216.5 km, view looking south with the 700 metre radius curve around to the right and the departure signals with the repeater posts at the far left and far right of the image. GeoData.
|
|
![Filename=227-14.jpg
Filesize=269KiB
Dimensions=1280x851
Date added=Nov 13, 2015 227-14.jpg](albums/Pilbara/227/thumb_227-14.jpg)
227-1486 viewsNelson Point, view of the under harbour portal arrangement, reclaimer 3 and other bits of now removed infrastructure can be seen. GeoData.
|
|
![Filename=229-09.jpg
Filesize=387KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-09.jpg](albums/Pilbara/229/thumb_229-09.jpg)
229-0986 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit. GeoData.
|
|
![Filename=229-10.jpg
Filesize=382KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-10.jpg](albums/Pilbara/229/thumb_229-10.jpg)
229-1086 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|
![Filename=229-16.jpg
Filesize=400KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-16.jpg](albums/Pilbara/229/thumb_229-16.jpg)
229-1686 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|
![Filename=230-11.jpg
Filesize=261KiB
Dimensions=843x1280
Date added=Nov 13, 2015 230-11.jpg](albums/Pilbara/230/thumb_230-11.jpg)
230-1186 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-14.jpg
Filesize=254KiB
Dimensions=851x1280
Date added=Nov 13, 2015 230-14.jpg](albums/Pilbara/230/thumb_230-14.jpg)
230-1486 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=231-04.jpg
Filesize=254KiB
Dimensions=1280x850
Date added=Mar 21, 2016 231-04.jpg](albums/Pilbara/231/thumb_231-04.jpg)
231-0486 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 'Yawata' serial 8412-07 / 93-141, note the difference in the liveries, 50 is in the teal and marigold logo and logo on the hood while 52 has the silver logo on the front only and no logo on the hood. GeoData.
|
|
![Filename=231-15.jpg
Filesize=260KiB
Dimensions=1280x844
Date added=Mar 21, 2016 231-15.jpg](albums/Pilbara/231/thumb_231-15.jpg)
231-1586 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|
![Filename=232-15.jpg
Filesize=198KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-15.jpg](albums/Pilbara/232/thumb_232-15.jpg)
232-1586 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.
|
|
![Filename=235-02.jpg
Filesize=210KiB
Dimensions=1280x848
Date added=Mar 21, 2016 235-02.jpg](albums/Pilbara/235/thumb_235-02.jpg)
235-0286 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
|
|
![Filename=235-11.jpg
Filesize=242KiB
Dimensions=1280x838
Date added=Mar 21, 2016 235-11.jpg](albums/Pilbara/235/thumb_235-11.jpg)
235-1186 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|
![Filename=236-20.jpg
Filesize=313KiB
Dimensions=1280x852
Date added=Apr 03, 2016 236-20.jpg](albums/Pilbara/236/thumb_236-20.jpg)
236-2086 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 sits out the front with new windscreen protectors or 'blinkers' fitted.
|
|
![Filename=060110_2175.jpg
Filesize=369KiB
Dimensions=1280x853
Date added=May 06, 2016 060110_2175.jpg](albums/SA_Scans/060110_SA_EP/thumb_060110_2175.jpg)
060110 217586 viewsCummins, empty grain train departing yard on the Penong mainline at the Bratten Way grade crossing behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|
![Filename=060110_2176.jpg
Filesize=405KiB
Dimensions=1280x853
Date added=May 06, 2016 060110_2176.jpg](albums/SA_Scans/060110_SA_EP/thumb_060110_2176.jpg)
060110 217686 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|
![Filename=060110_2177.jpg
Filesize=423KiB
Dimensions=1280x853
Date added=May 06, 2016 060110_2177.jpg](albums/SA_Scans/060110_SA_EP/thumb_060110_2177.jpg)
060110 217786 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|
![Filename=060110_2181.jpg
Filesize=462KiB
Dimensions=1280x853
Date added=May 06, 2016 060110_2181.jpg](albums/SA_Scans/060110_SA_EP/thumb_060110_2181.jpg)
060110 218186 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|
16478 files on 824 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
463 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|