Most viewed |

030411 142313340 viewsNunjikompita, a section where new ballast has started about a kilometre east of the yard.
|
|

060111 2284340 viewsMurdinga, rounding the curve before entering the station environs empty grain train running north behind ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004. 11th January 2006.
|
|

PD 12863340 viewsWest Kalgoorlie, AOPY 34082 with fleet number 951, one of seventy ex ANR coal waggons rebuilt from AOKF type by Bluebird Engineering SA in service with ARG on Koolyanobbing iron ore trains. They used to be three metres longer and originally built by Metropolitan Cammell Britain as GB type in 1952-55, seen here in a rake with sister waggons.
|
|

060117 2714340 viewsBardoc, AQNY 32184, one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic, view of number board and bogie, sulphur skip S8W, train 2029 loaded Malcolm freighter.
|
|

060528 4523340 viewsWest Kalgoorlie, APNY 31164, one of four built by Westrail Midland Workshops in 1978 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

100601 8441340 viewsWest Kalgoorlie, WNB 541, pneumatic discharge nickel concentrate waggon, leader of six units built by Bluebird Rail Services SA in 2010 for BHP Billiton.
|
|

100602 8667340 viewsWest Kalgoorlie, ATPF 579 fuel tank waggon built by WAGR Midland Workshops 1974 for Shell as WJP type 80.66 kL one compartment one dome, fitted with type F InterLock couplers.
|
|

100611 0350340 viewsMidland, APNY 31158 one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

227-04340 viewsNelson Point, looking across with Anderson Point on the left and Stanley Point on the right, Boodarie workshop can be made out with a train in front of it. Today this view is very different!! GeoData.
|
|

229-17340 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

231-14340 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

060110 2177340 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

060110 2192340 viewsYeelanna, the second person watches ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 as it shunts forward to cut out the empty cars for the siding. Approx. location of image.
|
|

160522 2043340 viewsWest Kalgoorlie, ATLY 1 Origin LPG tank waggon. Built as Tg type gas tank waggon by Comeng NSW as Tg 1 in Oct 1968 for South Australian Railways, to Victorian Railways in 1979 as TWF 10, then recoded to VTGX, then back to AN in 1988 as ATLX.
|
|

160523 3296340 viewsWest Kalgoorlie, ATQF 612 diesel fuel tanker, Shell Fleet No. TR721, one of two such waggons built by Indeng Qld in 1982 for Shell as type WJQ with an original capacity of 79000 litres, current diesel capacity of 72000 litres, fitted with type F InterLock couplers.
|
|

160525 4461340 viewsParkeston, 3PM7 priority service train, RRAY 7243 platform 4 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with Pacific National 46' 6" reefer PNXR 4893.
|
|

160525 4493340 viewsParkeston, 3PM7 priority service train, RRAY 7166 platform 2 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a Pacific National 48' curtainsider PNXC 006.
|
|

160528 8430340 viewsBinduli, intermodal train 6PM6, RQZY 7054 platform 3 of five unit bar coupled well container waggon set built in a batch of thirty two by Goninan NSW in 1995/96, loaded with a Cronos 40' 4EG1 type container TSPD 092174 double stacked with a Kinnear Transport 40' curtain sider container KIN 1.
|
|

160524 4048340 viewsBinduli, Melbourne bound steel train service 3PM4, RKQF 60243, empty slab steel waggon, originally a Tulloch NSW built louvre van type JLY/X from 1969-70, NLJY/X, converted at Bathurst Workshops to NQRX in 1988, then in 1989/90 to NKQF.
|
|

160524 4241340 viewsWest Kalgoorlie, 1MP2 steel train, shunts off waggons with a pair of Goninan built GE model Cv40-9i NR class units NR 66 serial 7250-12 / 96-268 and NR 32 serial 7250-06 / 97-234 performing the shunt.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
476 |  |
 |
 |
 |
 |
 |
 |
|