Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
227-10.jpg
227-1090 viewsNelson Point, a view from the rear of A berth at the salt pile and stacker, this was operated by Cargill at the time of the photo. The under harbour tunnel portal is on the right. GeoData.
227-16.jpg
227-1690 viewsNelson Point, from the rear of Shiploader 2 looking south with Shiploader 1 on the right on B berth, and the ore transporting infrastructure. GeoData.
229-16.jpg
229-1690 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
230-06.jpg
230-0690 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
230-08.jpg
230-0890 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train behind CM40-8M units 5654 and 5637 crossing the YT 311.5 km grade crossing. Geodata -22.713725, 119.055762 .
230-11.jpg
230-1190 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
231-07.jpg
231-0790 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
231-14.jpg
231-1490 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
231-15.jpg
231-1590 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
232-17.jpg
232-1790 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
233-35.jpg
233-3590 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
234-10.jpg
234-1090 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side radiator section. Circa 1998.
235-13.jpg
235-1390 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
236-20.jpg
236-2090 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 sits out the front with new windscreen protectors or 'blinkers' fitted.
239-33.jpg
239-3390 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
239-35.jpg
239-3590 viewsYandi Two, cab side shot of Goninan Dash 8 unit CM40-8M 5644 'Kangan' serial 8281-09/92-133, rebuilt from AE Goodwin built ALCo M636 5471 serial G6047-3 still with ALCo Hi-Ad bogies.
060110_2177.jpg
060110 217790 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
060110_2194.jpg
060110 219490 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 shunts forward to cut out the empty cars for the siding. Approx. location of image.
060110_2197.jpg
060110 219790 viewsYeelanna, trailing shot with two AE Goodwin built ALCo model DL531 units 830 class, 851 serial 84137 and 842 serial 84140 as they shunt along the mainline behind 1204. Approx. location of image.
060110_2205.jpg
060110 220590 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 stands on the mainline as the second person restores the point for the main, a rake of waggons in grain siding await loading, with the 5 ton crane also visible. Approx. location of image.
16480 files on 824 page(s) 479

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional