Most viewed |

171018 0954111 viewsTad Yard, overview of Roy Hill's fuel tanks and waggon loading gantry with a fuel train being loaded headed up by ES44ACi unit RHA 1020 serial number 64301 built in Erie Pennsylvania, USA by GE. 17th October 2018.
|
|

190107 0445111 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00356 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0561111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00290 built by CSR Yangtze Co China serial 2014/382-290 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0563111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00022 built by CSR Yangtze Co China serial 2014/382-22 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0577111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00217 built by CSR Yangtze Co China serial 2014/382-217 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0582111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00320 built by CSR Yangtze Co China serial 2014/382-320 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0640111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00189 built by CSR Yangtze Co China serial 2014/382-189 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1601111 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00040 built by CSR Yangtze Co China serial 2014/382-40 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1604111 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00234 built by CSR Yangtze Co China serial 2014/382-234 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1638111 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00366 built by CSR Yangtze Co China serial 2014/382-366 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1662111 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00115 built by CSR Yangtze Co China serial 2014/382-115 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1663111 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00310 built by CSR Yangtze Co China serial 2014/382-310 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080304 2181111 viewsThomas Yard, down the rail welding end, side view of control waggon 2342, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

110620 2284111 viewsChapman, the entire fleet of twelve FMG TK type fuel tank waggons all built in 2008 by CSR Zhuzhou Rolling Stock Works plant in China hurry south on the loaded run of the fuel train to Cloud Break mine. 20th June 2011.
|
|

249-37111 viewsBurrup Peninsula gas plant, view of storage tanks, plant and visitors centre. Approximate location. 18th December 1999.
|
|

140601 4463111 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7654 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

269-14111 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

150-30110 viewsLismore Victorian Oats Pool grain bunker and road transport discharge bay, looking towards Maroona.
|
|

150-31110 viewsLismore station building front elevation, looking across three yard tracks, building still used for safeworking purposes.
|
|

153-1-21110 viewsBacchus Marsh turntable looking at non-lever end interlock and side, shows walkway and underframe.
|
|
16867 files on 844 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
482 |  |
 |
 |
 |
 |
 |
 |
|