Most viewed |

161111 2514338 viewsBinduli, Kalgoorlie Freighter train 5025, NTAY type fuel tank waggon NTAY 3367 with 64,600 litre capacity for Caltex. Refurbished by Gemco WA in Feb 2014 from a Caltex NTAF type tank waggon NTAF 367 originally built by Transrail in 1977.
|
|

161111 2423338 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32207 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a Bis Industries roll-top 55UA type sulphur container SBIU 200625 and an undecorated Bis Industries hard-top 25U0 type sulphur container BISU 100047.
|
|

161116 5130338 viewsWest Kalgoorlie, Shell fuel train 3442, container flat waggon AQWY 30329, built by Tomlinson Steel WA in a batch of 161 WFX type waggons between 1969 and 1970. Fitted with three 20' wheel set carrying frames.
|
|

040815 171312338 viewsNelson Point, fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
|
|

040815 171246338 viewsNelson Point, side view of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
|
|

050518 2164338 viewsBing Siding. Side view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
|
|

050409 0404338 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050410 0517338 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050412 0821338 viewsAbydos Siding backtrack, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050801 4726338 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 1st August 2005.
|
|

060501 3929338 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

030415 154708338 viewsTarcoola, at the 504.5 km, looking south east along the No. 1 Water Road, first set of points is the Camp Train Road, then the two Loco Roads No. 1 and No. 2. GeoData location. 15th April 2003.
|
|

030415 154820338 viewsTarcoola, at the 504.5 km, looking south east along the No. 1 Water Road, set of points is the No. 2 Loco Road, No. 1 Loco and Camp Train roads are visible to the left. Water tank on stand. GeoData location. 15th April 2003.
|
|

240-18338 viewsWickham, left hand side number two end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

242-25338 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From right is a Goldsworthy Mining B class unit #2 built by English Electric serial number A-105, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit. May 2002.
|
|

190107 0453338 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon married pair set MHPY 00363 and MHPY 00364 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0549338 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00098 built by CSR Yangtze Co China serial 2014/382-98 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0554338 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00201 built by CSR Yangtze Co China serial 2014/382-201 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0556338 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00143 built by CSR Yangtze Co China serial 2014/382-143 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0568338 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00088 built by CSR Yangtze Co China serial 2014/382-88 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
487 |  |
 |
 |
 |
 |
 |
 |
|