Most viewed |

050421 1314386 viewsShaw Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the mainline track. 21st April 2005.
|
|

060710 6240386 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
|
|

100717 0682386 viewsFlash Butt yard, new rail stock carrier waggon 6031, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

030404 103651386 viewsPort Augusta Spencer Junction yard, National Rail Goninan built GE Cv40-9i model NR class unit NR 50 serial 7250-08 / 97-252 lay about the yard in between jobs. 4th April 2003.
|
|

030404 120343386 viewsStirling North, looking west to Port Augusta, line to Port Augusta power station is diverging left, the narrow gauge line for Pichi Richi Railway is on the far right.
|
|

170729 0163386 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
|
|

170729 0415386 viewsSeven Mile yard, a loaded train departs the yard for Parker Point dumpers behind General Electric built Dash 9-44CW unit 7044 serial 57095 in Pilbara Iron livery with HI reporting marks, ES44DCi unit 8134 in Rio Tinto stripes and another Dash 9-44CW unit 9407 in Pilbara Rail livery with Robe reporting marks. 29th July 2017. GeoData.
|
|

190107 0479386 viewsParkeston, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014 is pushed back along the loop to as the power consist of Pacific National NR 60 and NR 8 runs around the waggon rake.
|
|

190107 0639386 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00168 built by CSR Yangtze Co China serial 2014/382-168 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080304 2177386 viewsThomas Yard, down the rail welding end, side view of control waggon 2168, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2192386 viewsThomas Yard, looking south, long rake of waggons being run up and down the mainline to keep the wheels turning. 4th March 2008.
|
|

246-03386 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-37386 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|

250-19386 viewsWater hole somewhere in the Pilbara around the Dampier - Tom Price railway area. 21st October 2000.
|
|

210322 9566386 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 124 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

254-30386 viewsNunyerry weather station, located beside an abandoned landing strip. Chrysotile or white asbestos was originally mined in this area by Hanwright in the 1950s. GeoData location here. September 2001.
|
|

267-09386 viewsGoldsworthy Junction, BHP's 1230 empty departure with second unit the last GE rebuild CM40-8MEFI 5669 'Beilun' serial number 8412-02 / 95-160 with General Electric AC6000 unit 6076 on the point with two CM40-8M mid-train units and 208 waggons powers along the Newman mainline. 1247 hrs 12th of April 2002.
|
|

267-12386 viewsGoldsworthy Junction, BHP's 1230 empty departure mid-train unit Goninan rebuild CM40-8M GE units 5651 'Tobata' serial number 8412-08 / 93-142 104 waggons from the lead passes the Goldsworthy Junction relay room as Pope reads the newspaper. 1247 hrs Friday 12th of April 2002.
|
|

267-22386 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
|
|

283-34386 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they pass through the cutting at the 37.5 km pipe bridge. 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
495 |  |
 |
 |
 |
 |
 |
 |
|