Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100717_0671.jpg
100717 0671108 viewsFlash Butt yard, new rail stock carrier waggon 6025, built by Gemco Rail in late 2009-10 with Barber bogies.
150729_9455.jpg
150729 9455108 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
160128_00333.jpg
160128 00333108 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0023, one of a batch of ten built in 2014.
160128_00337.jpg
160128 00337108 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0041, one of a second batch delivered in 2015 with safety slogan 'Stay alert don't get hurt'.
170729_0172.jpg
170729 0172108 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
170510_8284.jpg
170510 8284108 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
030416_084004.jpg
030416 084004108 viewsCarnes Siding located at the 566.4 km on the Central Australian line from Tarcoola to Alice Springs. Station nameboard. GeoData location. 16th April 2003.
190107_0479.jpg
190107 0479108 viewsParkeston, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014 is pushed back along the loop to as the power consist of Pacific National NR 60 and NR 8 runs around the waggon rake.
190107_0547.jpg
190107 0547108 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00339 built by CSR Yangtze Co China serial 2014/382-339 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1668.jpg
190109 1668108 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00194 built by CSR Yangtze Co China serial 2014/382-194 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080120_1469.jpg
080120 1469108 viewsThomas Yard, new FMG ore waggon pair 1263 slave and 2264 control waggons, 22.6 tonnes tare with rotary coupler, and the master at 22.9 tonnes. View from the handbrake end coupled to a GE Dash 9-44CW unit 011. 20th January 2008.
254-03.jpg
254-03108 viewsWodgina mine site, bull buggy from a cut down 60 series Toyota Landcruiser from Wallareenya Station.
140601_4455.jpg
140601 4455108 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8054-2 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
125-24.jpg
125-24107 viewsWallan across Merri Creek, V/Line broad gauge B class Clyde Engineering EMD model ML2 serial ML2-6 still in Victorian Railways livery leads a sleeper discharge train on the up broad gauge line.
150-23.jpg
150-23107 viewsLismore, sheep loading race and platform, tow tier loading race, doors on front are hinged to drop down to waggon entry points.
150-27.jpg
150-27107 viewsLismore, view of cattle holding yard from loading race.
220-26.jpg
220-26107 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
220-27.jpg
220-27107 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
100731_02346.jpg
100731 02346107 viewsWOB type iron ore waggon WOB 31379 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 304 for Koolyanobbing iron ore operations, the WAGR and Comeng builders plates are visible in the waggon sill, on loaded train 6413 at Binduli Triangle, 31st July 2010.
100731_02347.jpg
100731 02347107 viewsWO type iron ore waggon WO 31269 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 152 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 6413 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
16867 files on 844 page(s) 497

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional