Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060111_2407.jpg
060111 240787 viewsWudinna, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004, 1203 and two ALCo units 850 and 905 shunt back down the mainline at Wudinna as they run round their consist. 11th January 2006.
060113_2438.jpg
060113 243887 viewsThevenard, at the Gypsum Resources Australian (GRA) gypsum unloading site, 1604 leads a triple consist of Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. Friday 13th January 2006.
060113_2528.jpg
060113 252887 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
130703_0206.jpg
130703 020687 viewsTooligie, HAN type bogie grain hopper waggon HAN 28, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN class for the Eyre Peninsula system.
130704_0479.jpg
130704 047987 viewsKyancutta, HCN type bogie grain hopper waggon HCN 35, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130708_0759.jpg
130708 075987 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 15, in GWA corporate orange livery of owner Genesee & Wyoming Australia, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130708_0777.jpg
130708 077787 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 11 F, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130708_0983.jpg
130708 098387 viewsThevenard,
100609_09966.jpg
100609 0996687 viewsMidland, AQWY 30366 container waggon, originally one of one hundred and sixty one built by Tomlinson Steel in 1970 as WFX type, to WQCX in 1980. Loaded with two 20' 22G1 type containers loaded with lead, Xines XINU 148992 and Hapag-Lloyd HLXU 207013.
100609_10014.jpg
100609 1001487 viewsMidland, AQWY 30359 container waggon originally one of one hundred and sixty one built by Tomlinson Steel in 1970 as WFX type, to WQCX in 1980. Loaded with two 20' 22G1 type containers for Triton TTNU 368943 and Mediterranean Shipping MEDU 106868.
100611_0352.jpg
100611 035287 viewsMidland, APNY 31160, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
221-28.jpg
221-2887 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
221-36.jpg
221-3687 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.
222-29.jpg
222-2987 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie powers away with an empty train with 7091 following a crew change with a loaded train.
224-26.jpg
224-2687 viewsBing siding, the afternoon empty to Yandi waits in the loop as a loaded behind two Goninan rebuilt CM40-8M GE units rolls through on the mainline, 5637 'De Grey' serial 8181-01 / 92-123 trails sister unit 5642 'Wallareenya'. GeoData.
225-04.jpg
225-0487 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie. Flashbutt yard is to the right. GeoData.
226-04.jpg
226-0487 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
227-07.jpg
227-0787 viewsNelson Point, view along the rear of A and B berths from Shiploader 2, salt pile on the left, then the under harbour tunnel portal, old reclaimers 3 and 4 with the crushing building in the distance, which has now been demolished, and the rear of Shiploader 1 on B berth. GeoData.
227-27.jpg
227-2787 views30 km area, mid-train remote units 5659 and 5641 both Goninan CM40-8M GE rebuilds. GeoData.
228-02.jpg
228-0287 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
16480 files on 824 page(s) 499

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional