Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050704_3974.jpg
0012 Comeng NSW 050704 3974428 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons, view of A end and bogie detail.
051001_5722.jpg
6201 Comeng WA 051001 5722428 viewsBoodarie, the Steel Train or rail recovery and transport train flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
060414_3443.jpg
0510 Mt Newman Mining Workshops 060414 3443428 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car. The others in the fleet are 40, 60 and 100 tons. April 14, 2006.
050410_0524.jpg
050410 0524428 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050411_0611.jpg
050411 0611428 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 runs along the Newman mainline towards Bing Siding. 11th April 2005.
110411_10014.jpg
0011 Comeng NSW 110411 10014428 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
030404_082917.jpg
030404 082917428 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's NR class units, showing one and a half stacking and new vehicles on flat waggons. 4th April 2003.
IC20_070908_0596.jpg
IC20 070908 0596428 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard August 8, 2007.
170510_8282.jpg
170510 8282428 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
171121_0966.jpg
171121 0966428 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.
171121_0967.jpg
171121 0967428 viewsBarker Siding, Loram rail grinder MPC 2, grinder cart. 21st November 2017.
240-22.jpg
240-22428 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
241-11.jpg
241-11428 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
180615_1574.jpg
180615 1574428 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 02.
Roland Depth photo.
190107_0454.jpg
190107 0454428 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00364 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0490.jpg
190107 0490428 viewsParkeston, side view of Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014.
190107_0593.jpg
190107 0593428 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00273 built by CSR Yangtze Co China serial 2014/382-273 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0614.jpg
190107 0614428 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00246 built by CSR Yangtze Co China serial 2014/382-246 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1601.jpg
190109 1601428 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00040 built by CSR Yangtze Co China serial 2014/382-40 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1612.jpg
190109 1612428 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
19216 files on 961 page(s) 500

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional