Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
225-20.jpg
225-2057 viewsAt the 24.1 km grade crossing on the BHP Newman line, General Electric AC6000 model unit 6074 serial 51066 built at GE Erie leads the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
225-29.jpg
225-2957 viewsBing siding backtrack, Tomlinson WA built GML ore waggon 8104 loaded with ballast, side view. GeoData.
226-31.jpg
226-3157 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.
227-12.jpg
227-1257 viewsNelson Point, view from rear of Shiploader 2, salt pile, manganese stockpile in the distance, stacker 3, the Port Hedland water tower, then 101-102 sample station and Tertiary Crushing Building One or TCB1, stacker 4 and reclaimer 3 with the under harbour portal in the foreground. GeoData.
227-24.jpg
227-2457 views30 km area, second unit on an empty ore train 5651 'Tobata' serial 8412-08 / 93-142 a Goninan CM40-8M GE rebuild. GeoData.
227-27.jpg
227-2757 views30 km area, mid-train remote units 5659 and 5641 both Goninan CM40-8M GE rebuilds. GeoData.
232-22.jpg
232-2257 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
232-24.jpg
232-2457 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
233-03.jpg
233-0357 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
233-06.jpg
233-0657 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
233-14.jpg
233-1457 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
234-37.jpg
234-3757 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
235-28.jpg
235-2857 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time and also has the late marigold style BHP logo, cab side and Alco Hi-Ad bogie.
235-36.jpg
235-3657 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time with second unit also a Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128, note the differences in the two locos as 5653 is rebuilt from a Comeng built ALCo M636 while 5639 was an AE Goodwin built ALCo C636. 5654 also has the late marigold style BHP logo.
236-24.jpg
236-2457 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 being driven out and 6077 beside it.
236-30.jpg
236-3057 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted next to sister unit 6077.
160525_4816.jpg
160525 481657 viewsWest Kalgoorlie, misnumbered AQHY 30088, plate shows AQHY 3008 L, with sulphuric acid tank CSA 0126, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of empty acid train 4405 departing in the yard. CSA 0126 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160525_4827.jpg
160525 482757 viewsWest Kalgoorlie, NTBF type fuel tank waggon NTBF 6118, with former owners name (Freight Australia) visible. Originally built by Comeng NSW in 1975 as an SCA type 69,000 litre bitumen tanker SCA 267 for Shell NSW.
160531_9621.jpg
160531 962157 viewsWest Kalgoorlie, diesel fuel tanker ATMY 553, built by Tulloch Ltd NSW for BP Oil in 1971 as WJM type, capacity of 102000 litres, diesel capacity of 76000 litres, refurbished by Gemco WA in Oct 2015.
160531_9882.jpg
160531 988257 viewsWest Kalgoorlie, diesel fuel tank waggon ATEY 4725, BP Oil service, ex Ampol, other codes include ex NSW NTAF, WTEF and WTEY.
16099 files on 805 page(s) 522

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional