Most viewed |
![Filename=150729_9455.jpg
Filesize=463KiB
Dimensions=1280x853
Date added=Mar 21, 2017 150729_9455.jpg](albums/Pilbara/BHP_Rolling_Stock_-_non_ore/thumb_150729_9455.jpg)
150729 945573 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
|
|
![Filename=141124_7078.jpg
Filesize=678KiB
Dimensions=1280x853
Date added=Nov 03, 2017 141124_7078.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_141124_7078.jpg)
141124 707873 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at Parker Point, Dampier on 24th November 2014.
|
|
![Filename=170510_8282.jpg
Filesize=446KiB
Dimensions=1280x853
Date added=Nov 03, 2017 170510_8282.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_170510_8282.jpg)
170510 828273 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|
![Filename=170728_09690.jpg
Filesize=468KiB
Dimensions=1280x853
Date added=Nov 03, 2017 170728_09690.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_170728_09690.jpg)
170728 0969073 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|
![Filename=241-14.jpg
Filesize=458KiB
Dimensions=1280x853
Date added=Feb 19, 2018 241-14.jpg](albums/Pilbara/241/thumb_241-14.jpg)
241-1473 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood doors open, the Dash 8 radiator frame fitted to it following collision repairs is also evident. June 2002.
|
|
![Filename=190107_0625.jpg
Filesize=590KiB
Dimensions=1280x853
Date added=Feb 07, 2019 190107_0625.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190107_0625.jpg)
190107 062573 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00043 built by CSR Yangtze Co China serial 2014/382-43 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190109_1603.jpg
Filesize=644KiB
Dimensions=1280x853
Date added=Feb 22, 2019 190109_1603.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190109_1603.jpg)
190109 160373 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00233 built by CSR Yangtze Co China serial 2014/382-233 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190109_1641.jpg
Filesize=615KiB
Dimensions=1280x853
Date added=Feb 22, 2019 190109_1641.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190109_1641.jpg)
190109 164173 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00335 built by CSR Yangtze Co China serial 2014/382-335 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=243-14.jpg
Filesize=474KiB
Dimensions=1280x843
Date added=Sep 19, 2019 243-14.jpg](albums/Pilbara/243/thumb_243-14.jpg)
243-1473 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|
![Filename=243-18.jpg
Filesize=445KiB
Dimensions=1280x846
Date added=Sep 19, 2019 243-18.jpg](albums/Pilbara/243/thumb_243-18.jpg)
243-1873 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|
![Filename=080116_1365.jpg
Filesize=423KiB
Dimensions=1280x853
Date added=Apr 10, 2020 080116_1365.jpg](albums/Pilbara/FMG_Rolling_Stock/thumb_080116_1365.jpg)
080116 136573 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
|
|
![Filename=080116_1379.jpg
Filesize=400KiB
Dimensions=1280x853
Date added=Apr 10, 2020 080116_1379.jpg](albums/Pilbara/FMG_Rolling_Stock/thumb_080116_1379.jpg)
080116 137973 viewsChapman Siding 69 km, FMG slave waggon 1371 tare 22.6 tonnes with bar coupling to master, view bogies and number decal looking north. Built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007. 16th January 2008.
|
|
![Filename=080120_1469.jpg
Filesize=395KiB
Dimensions=1280x853
Date added=Apr 10, 2020 080120_1469.jpg](albums/Pilbara/FMG_Rolling_Stock/thumb_080120_1469.jpg)
080120 146973 viewsThomas Yard, new FMG ore waggon pair 1263 slave and 2264 control waggons, 22.6 tonnes tare with rotary coupler, and the master at 22.9 tonnes. View from the handbrake end coupled to a GE Dash 9-44CW unit 011. 20th January 2008.
|
|
![Filename=246-24.jpg
Filesize=492KiB
Dimensions=1280x853
Date added=Oct 16, 2020 246-24.jpg](albums/Pilbara/246/thumb_246-24.jpg)
246-2473 viewsCape Lambert, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng style flat fuel tank, while above is GE and Pilbara Cab. 22nd May 2002.
|
|
![Filename=267-27.jpg
Filesize=811KiB
Dimensions=1280x853
Date added=Nov 21, 2022 267-27.jpg](albums/Pilbara/267/thumb_267-27.jpg)
267-2773 views39 km Newman line, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 slows as it brings the Sundowner special to a stop at the 39 km detector site on the Newman mainline.
The trailing unit is 5653.
This was a special for the 25 years of the Alstom / BHP service agreement.
Friday 12th of April 2002.
|
|
![Filename=269-14.jpg
Filesize=838KiB
Dimensions=1280x853
Date added=Dec 23, 2022 269-14.jpg](albums/Pilbara/269/thumb_269-14.jpg)
269-1473 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|
![Filename=6076_roster_lhs_040912_141452.jpg
Filesize=646KiB
Dimensions=1280x853
Date added=Aug 22, 2023 6076_roster_lhs_040912_141452.jpg](albums/Pilbara/roster/thumb_6076_roster_lhs_040912_141452.jpg)
6076 roster lhs 040912 14145273 viewsNelson Point, BHP Billiton General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial number 51068. 12th of September 2004.
|
|
![Filename=117-29.jpg
Filesize=252KiB
Dimensions=1280x847
Date added=May 05, 2014 117-29.jpg](albums/Vic_Scans/117/thumb_117-29.jpg)
117-2972 viewsSeymour loco depot V/Line B class loco B 61 Clyde Engineering EMD model ML2 serial ML2-2, cab side view, bogie.
|
|
![Filename=100731_02346.jpg
Filesize=144KiB
Dimensions=1024x683
Date added=Jan 27, 2015 100731_02346.jpg](albums/Inter_Scans/WA_SG_Ironore_waggons/thumb_100731_02346.jpg)
100731 0234672 viewsWOB type iron ore waggon WOB 31379 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 304 for Koolyanobbing iron ore operations, the WAGR and Comeng builders plates are visible in the waggon sill, on loaded train 6413 at Binduli Triangle, 31st July 2010.
|
|
![Filename=100731_02439.jpg
Filesize=158KiB
Dimensions=1024x683
Date added=Jan 27, 2015 100731_02439.jpg](albums/Inter_Scans/WA_SG_Ironore_waggons/thumb_100731_02439.jpg)
100731 0243972 viewsWOB type iron ore waggon WOB 31386 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 311 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, on empty train 6418 at Binduli Triangle, 31st July 2010.
|
|
16448 files on 823 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
530 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|