Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
150523_8216.jpg
150523 821658 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0032, one of a second batch delivered in 2015 with safety slogan 'Start with safety'.
150523_8224.jpg
150523 822458 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0033, one of a second batch delivered in 2015 with safety slogan 'Don't drive tired'.
150619_9074.jpg
150619 907458 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggons 0710, 0706 and 0713 await their next duty.
150620_9328.jpg
150620 932858 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
160128_00336.jpg
160128 0033658 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
160128_00337.jpg
160128 0033758 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0041, one of a second batch delivered in 2015 with safety slogan 'Stay alert don't get hurt'.
100329_8039.jpg
100329 803958 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
170510_8292.jpg
170510 829258 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
170728_09687.jpg
170728 0968758 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
170728_09688.jpg
170728 0968858 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
243-03.jpg
243-0358 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From left is Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Goldsworthy Mining B class unit #2 built by English Electric serial number A-105. August 2003.
243-17.jpg
243-1758 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080116_1367.jpg
080116 136758 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, looking south along the rake with 1395 closest to the camera. 16th January 2008.
080116_1371.jpg
080116 137158 viewsChapman Siding 69 km, FMG slave waggon 1395 tare 22.6 tonnes with rotary coupler built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007, stands on the passing track. 16th January 2008.
110620_2281.jpg
110620 228158 viewsChapman, FMG TK type fuel tank waggon TK 01 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as the first of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
249-01.jpg
249-0158 viewsYule River road crossing on the former Hedland - Wittenoom Road in flood after Tropical Cyclone John in December 1999. Approximate location.
148-32.jpg
148-3257 viewsWangaratta yard looking north along Main Line with points from No. 1 Road visible, Siding 'C' and Nos. 4 and 5 Roads on the left. Signal Post 23 and the standard gauge line are visible in the cutting at the right.
127-33.jpg
127-3357 viewsElmore derelict loading ramp, track view.
100731_02427.jpg
100731 0242757 viewsWOE type iron ore waggon WOE 30257 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-007 and fleet number 607 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100822_5940.jpg
100822 594057 viewsWOB type iron ore waggon WOB 31379 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 304 for Koolyanobbing iron ore operations, the WAGR and Comeng builders plates are visible in the waggon sill, Binduli Triangle 22nd August 2010.
16103 files on 806 page(s) 532

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional