Most viewed |

110208 9441100 viewsFlash Butt yard, new rail stock carrier waggon 6033 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110411 10002100 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

110411 10011100 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0017 from 1974-5, one of six such tank waggons.
|
|

150314 7741100 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0030, the final member of a batch of ten built in 2014.
|
|

150314 7753100 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0023, one of a batch of ten built in 2014.
|
|

150523 8209100 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|

170510 8283100 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

170510 8292100 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

241-12100 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|

241-31100 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.
|
|

243-10100 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

243-17100 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

080116 1376100 viewsChapman Siding, FMG slave waggon 1187, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007, view of the number decal builders plate and bracket for RFID tag with the last painted date placard. 16th January 2008.
|
|

246-13100 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-24100 viewsCape Lambert, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng style flat fuel tank, while above is GE and Pilbara Cab. 22nd May 2002.
|
|

247-21100 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
|
|

249-05100 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

140601 4451100 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8015-2 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

040912 152402r100 viewsNelson Point, condemned Comeng WA built BHP ore waggon 1560, used here as a ground anchor on Stacker 4. Waggon 1560 was built in an order of two hundred and eighty-eight waggons in 1974. 12th of September 2004.
|
|

153-1-2399 viewsBacchus Marsh turntable looking at lever end interlock and side, shows walkway and underframe.
|
|
16865 files on 844 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
545 |  |
 |
 |
 |
 |
 |
 |
|