Most viewed |
110411 1000882 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0007 one of six such tank waggons built in 1970-71.
|
|
110411 1002782 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|
150314 774082 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0030, the final member of a batch of ten built in 2014.
|
|
150314 774182 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0030, the final member of a batch of ten built in 2014.
|
|
150523 820882 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|
150523 821082 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0044, one of a second batch delivered in 2015 with safety slogan 'Don't drive distracted'.
|
|
160128 0034082 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
|
|
170728 0969082 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|
030415 15490982 viewsTarcoola, at the 504.5 km, looking south east, roads are, Camp Train, No. 1 Loco, No. 2 Loco and No. 1 Water Road, mainline to the left. Water tank on stand. GeoData location. 15th April 2003.
|
|
030415 15512682 viewsTarcoola, at the 504.5 km, looking east, end of the No. 2 Loco Road, No. 1 Water Road curving in from the right, spur from Camp Train and No. 1 Loco Roads as left and mainline to the far left. GeoData location. 15th April 2003.
|
|
171018 095882 viewsTad Yard and Roy Hill's General Eclectic ES44ACi model unit RHA 1020 serial number 64301 idles away on the fuel train with tank waggons TA 1010 and TA 1003 which were built by China Southern Rail at their Zhuzhou works. This ES44ACi unit was built in February 2016 as Erie Pennsylvania, USA. 18th October 2017.
|
|
241-1282 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|
241-2682 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation with two C36-7M units 5506 and 5510 also awaiting removal from site. June 2002.
|
|
241-3182 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.
|
|
190107 059982 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00009 built by CSR Yangtze Co China serial 2014/382-9 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 060082 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00291 built by CSR Yangtze Co China serial 2014/382-291 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 163082 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00019 built by CSR Yangtze Co China serial 2014/382-19 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190109 163982 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00231 built by CSR Yangtze Co China serial 2014/382-231 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
243-1582 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|
080116 137282 viewsChapman Siding 69 km, FMG master or control waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by China Southern or CSR at their the Zhuzhou Rolling Stock Works in China in 2007, stands on the passing track. 16th January 2008.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
546 | |
|
|
|
|
|
|
|