Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
225-25.jpg
225-2557 viewsAt the 24.1 km grade crossing on the BHP Newman line the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.
226-23.jpg
226-2357 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
226-28.jpg
226-2857 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
227-25.jpg
227-2557 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
228-35.jpg
228-3557 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
229-19.jpg
229-1957 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-22.jpg
229-2257 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-30.jpg
229-3057 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
229-33.jpg
229-3357 viewsYandi Two loadout exit side, as second unit 5642 'Wallareenya' serial 8281-07 / 92-131 a Goninan rebuild CM40-8M GE unit trails sister unit 5650 drag a loading train at 1.2 km/h around the loadout balloon, the waggon behind 5642 is an original Oroville waggon. GeoData.
230-23.jpg
230-2357 viewsYandi Two balloon loop, cab side view of Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 with ALCo Hi-Ad bogie. Geodata -22.718338, 119.039909 .
235-21.jpg
235-2157 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time with second unit also a Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128, note the differences in the two locos as 5653 is rebuilt from a Comeng built ALCo M636 while 5639 was an AE Goodwin built ALCo C636. 5654 also has the late marigold style BHP logo.
235-23.jpg
235-2357 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time and also has the late marigold style BHP logo.
236-29.jpg
236-2957 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
160523_3342.jpg
160523 334257 viewsWest Kalgoorlie, AQHY 30090 with CSA 0092, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0092 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160525_4804.jpg
160525 480457 viewsWest Kalgoorlie, AQHY 30084 with sulphuric acid tank CSA 0097, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of empty acid train 4405 departing in the yard. CSA 0097 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160525_4832.jpg
160525 483257 viewsWest Kalgoorlie, ATBY 14590 fuel tank waggon built by Westrail Midland Workshops in a batch of nine in 1981-82 for Bain Leasing Pty Ltd as type JPB, 82,000 litres for narrow gauge, recoded to JPBA in 1986, converted to standard gauge as WJPB.
160528_8366.jpg
160528 836657 viewsParkeston, near the quarantine station, stored former Mobil Oil NSW NTAF waggons, from left: NTAF 5454, 5451, 5450, 5453 and 5449. I think these are Indeng Qld built NTAF waggons from a batch of seven such tanks built for Mobil of NSW in 1981 and numbered NTAF 449 to 455.
160523_3614.jpg
160523 361457 viewsWest Kalgoorlie, AQHY 30031 with sulphuric acid tank CSA 0107, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of loaded acid train 2406 arriving back in the yard. CSA 0107 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160525_4468.jpg
160525 446857 viewsParkeston, 3PM7 priority service train, RRAY 7190 platform 3 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a Rail Containers sea2rail 48' box SCFU 411210.
160525_4521.jpg
160525 452157 viewsParkeston, 3PM7 priority service train, RRAY 7208 platform 4 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a Pacific National 48' curtainsider PNXC 4492.
16103 files on 806 page(s) 550

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional