Most viewed |

060501 391198 viewsAbydos Siding backtrack, Speno rail grinder RG 2, first and second grinding modules. 1st May 2006.
|
|

060501 392298 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module. 1st May 2006.
|
|

080621 271498 viewsTabba South, rail recovery and transport train, waggon #29, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible. In between 6702 and 6201.
|
|

110208 942998 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
|
|

110411 0998698 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0008 one of six such tank waggons built in 1970-71.
|
|

110411 1000998 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
|
|

110411 1002698 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

110411 1002798 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

150314 774898 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0027, one of a batch of ten built in 2014.
|
|

150523 820598 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0035, one of a second batch delivered in 2015 with safety slogan 'Take time to work safely' coupled to Comeng WA built tank waggon 0013 from 1974-75.
|
|

150523 821398 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015, detail view of A end.
|
|

060715 695098 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
|
|

070908 059698 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
|
|

243-0398 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From left is Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Goldsworthy Mining B class unit #2 built by English Electric serial number A-105. August 2003.
|
|

243-1798 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

080124 162998 viewsChapman Siding, side view of slave waggon 1255, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

080304 218298 viewsThomas Yard, down the rail welding end, side view of slave waggon 1337, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

110620 227998 viewsChapman, FMG TK type fuel tank waggon TK 07 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

246-2498 viewsCape Lambert, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng style flat fuel tank, while above is GE and Pilbara Cab. 22nd May 2002.
|
|

249-0598 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|
16863 files on 844 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
560 |  |
 |
 |
 |
 |
 |
 |
|