Most viewed |

130708 0972363 viewsThevenard,
|
|

130708 0977363 viewsThevenard,
|
|

130708 0983363 viewsThevenard,
|
|

PD 12843363 viewsWest Kalgoorlie, AOPY 32400 with fleet number 930, one of seventy ex ANR coal waggons rebuilt from AOKF type by Bluebird Engineering SA in service with ARG on Koolyanobbing iron ore trains. They used to be three metres longer and originally built by Metropolitan Cammell Britain as GB type in 1952-55, seen here in a rake with sister waggons.
|
|

070529 9330363 viewsWest Kalgoorlie, WGL 635 originally one of ten units built by Westrail Midland Workshops in 1976 as WFN type bogie flat waggon for Western Mining Corporation for nickel matte kibble traffic as WFN 605 and converted to WGL for bagged nickel matte in 1979.
|
|

100601 8426363 viewsWest Kalgoorlie, ATPF 607 fuel tank waggon, built by Westrail Midland Workshops 1982 for Shell as WJP type, 80.66 kL one compartment one dome, fitted with type F InterLock couplers.
|
|

100601 8484363 viewsWest Kalgoorlie, WN 528, pneumatic discharge nickel concentrate waggon, one of thirty units built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|

100609 09961363 viewsMidland, APNY 31161 one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

100609 09960363 viewsMidland, APNY 31158 one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

225-02363 viewsBing siding at the 17.5 km, Goninan rebuild CM40-8MEFI GE loco 5669 'Beilun' serial 8412-02 / 95-160 was the last Dash 8 built for BHP Iron Ore, seen here sitting at BNN 6 signal awaiting a path, note the CCTV camera mounted under the radiator wing as a trial for single man crewing when long end leading. GeoData.
|
|

225-15363 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with another AC6000 unit mid-train. GeoData.
|
|

225-21363 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

231-15363 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

232-04363 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.
|
|

232-27363 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|

233-12363 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

234-14363 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of right hand side engine hood and fuel tank. Circa 1998.
|
|

238-24363 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|

060110 2181363 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

160524 4290363 viewsWest Kalgoorlie, 1MP2 steel train, RKLY 20209, totally unrecognisable from original build by EPT NSW 1979-81 as part of a batch of two hundred BDY type 14.20 metre open waggons, had several recoding's prior to its current guise, loaded with two RH type coil containers or 'butter boxes' RH 458 and RH 390.
|
|
| 19087 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
563 |  |
 |
 |
 |
 |
 |
 |
|