Most viewed |

130720 1435357 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
|
|

130720 1563357 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 717, modified from a similar CHQY class with the end framing removed.
|
|

131122 3312357 viewsRio Tinto compressor waggon set CB 08, has been upgraded from the original Robe River compressor waggon set IC 22 with air receiver and IC 23 with two Atlas Copco XAS 97 units replacing the original Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 22nd November 2013.
|
|

241-14357 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood doors open, the Dash 8 radiator frame fitted to it following collision repairs is also evident. June 2002.
|
|

241-19357 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Three quarter rear view. June 2002.
|
|

190107 0587357 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00200 built by CSR Yangtze Co China serial 2014/382-200 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0600357 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00291 built by CSR Yangtze Co China serial 2014/382-291 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0621357 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00188 built by CSR Yangtze Co China serial 2014/382-188 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080116 1377357 viewsChapman Siding, FMG slave waggon 1187, built by CSR at their Zhuzhou Rolling Stock Works in China during August 2007, view of the builders plate and bracket for RFID tag. 16th January 2008.
|
|

080124 1625357 viewsChapman Siding, new FMG ore waggon pair 1255 slave and 2256 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

246-26357 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|

247-16357 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper. 22nd May 2002.
|
|

248-19357 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On N2 is a radiator view of AE Goodwin built ALCo M636 unit 9412 serial G-6060-3 from December 1971 and originally numbered 262.003 during construction and then 1712. Behind it on N3 is the cab of 9416 also an AE Goodwin built ALCo M636 serial G-6046-16 from January 1973 and originally numbered 1716. Approximate location. 24th April 2004.
|
|

250-16357 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
|
|

251-06357 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from 1969 AE Goodwin built ALCo C636 with serial number G6035-2 and road number 5461 and assigned new serial number 4839-03 / 87-072. It was delivered in Mt Newman Mining orange and was named Ethel Creek, then in 1991 5507 emerged in BHP livery carrying Mt Whaleback, then renamed to Corunna Downs and again finally to Nimingarra, it was also one of three units to carry the Goldsworthy Joint Venture lettering. In 2003 it was fully rebuilt and leased to Pilbara Rail in that livery and numbered 5051. It survives stored at 7 mile complex as at Dec 2021. 22nd April 2000.
|
|

245-17357 viewsWudinna, empty grain train shunts back into the grain siding with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
|
|

140601 4458357 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7648 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

267-18357 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
|
|

269-18357 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

283-32357 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they power through the cutting up a short grade at the 37.5 km pipe bridge. 9414 with serial number 8206-11 / 91-124 was rebuilt by Goninan in 1991 from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. 22nd of May 2002.
|
|
| 19087 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
563 |  |
 |
 |
 |
 |
 |
 |
|