Most viewed |

040814 092225267 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project, handbrake end view.
|
|

050410 0542267 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

050518 2101267 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 760.
|
|

050518 2129267 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows bogie detail, AT & SF CS-3000 bogie casting with CFCLA id of CQFE 093
|
|

050518 2188267 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 508, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050801 4765267 viewsFlash Butt yard, rail recovery and transport train, builders plate of 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970.
|
|

050801 4769267 viewsFlash Butt yard, rail recovery and transport train flat waggon #27, third lead off waggon, 6205, built by Comeng WA in January 1977 under order no. 07-M-282 RY.
|
|

051001 5643267 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, through brake pipe is visible over the top of waggon.
|
|

051001 5684267 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

051001 5727267 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

051001 5729267 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
|
|

050315 0242267 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0010 and others in the BHP blue and white livery.
|
|

050522 2729267 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #19, 6013, built by Scotts of Ipswich Qld in 1970.
|
|

060429 3739267 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
|
|

060429 3754267 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|

060501 3874267 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, side dump waggon 703.
|
|

060714 6895267 viewsGarden Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity, bogie and handbrake detail.
|
|

050409 0404267 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050410 0516267 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050421 1176267 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper number board detail view. 21st April 2005.
|
|
18831 files on 942 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
565 |  |
 |
 |
 |
 |
 |
 |
|