Most viewed |

040806 091046370 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040806 101934370 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of brake lever arrangement.
|
|

040815 171312370 viewsNelson Point, fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
|
|

050414 0943370 viewsFlash Butt yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970.
|
|

050518 2084370 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 755.
|
|

050518 2201370 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

050704 3977370 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, detail of the A end and bogie, wearing the BHP Billiton Earth livery.
|
|

051001 5737370 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|

051001 5740370 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
|
|

050525 2991370 viewsMooka Siding, rail recovery and transport train flat waggon #23, 6208, built by Comeng WA in February 1977 under order number 07-M-282 RY.
|
|

060429 3743370 viewsFlash Butt yard, Pony waggon 9001, originally built by Scotts of Ipswich Qld as a box car or covered van in December 1971, heavily modified and converted for Pony traffic.
|
|

050411 0599370 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line at signal GJ 9 with the Newman mainline in the foreground. 11th April 2005.
|
|

050421 1610370 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

050801 4719370 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

110411 09977370 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

030403 154420370 viewsGladstone, former South Australian Railways AE Goodwin built DL500G ALCo designated the 700 class, class leader 701 serial G6042-2 leads a grain train with an ALF class and first waggon a former WAGR WW now WWS grain waggon, train being loaded on the 3rd April 2003.
|
|

170510 8294370 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

241-33370 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.
|
|

190109 1556370 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL 005 'Carina Flyer' with serial number R-0113-05/14-508 and is a UGL Rail Broadmeadow NSW built GE C44ACi model locomotive, one of six such units built for Mineral Resources in 2014.
|
|

190109 1639370 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00231 built by CSR Yangtze Co China serial 2014/382-231 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
574 |  |
 |
 |
 |
 |
 |
 |
|