Most viewed |

161112 2999265 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1690, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with original style sulphur container S7N G836 with sliding tarpaulin and Bis Industries hard-top type 25U0 container BISU 100105.
|
|

161112 3036265 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, AQNY type waggon AQNY 32154 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a pair of original style sulphur containers with sliding tarpaulins, S38A G830 and S154K G937.
|
|

161112 3458265 viewsBinduli, loaded Hampton acid train 7406 with AQHY 30098 with sulphuric acid tank CSA 0127, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0127 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions.
|
|

161112 3459265 viewsBinduli, loaded Hampton acid train 7406 with AQHY 30090 with sulphuric acid tank CSA 0092, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0092 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions.
|
|

161112 3460265 viewsBinduli, loaded Hampton acid train 7406 with AQHY 30110 with sulphuric acid tank CSA 0118, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0118 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions.
|
|

050414 0943265 viewsFlash Butt yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970.
|
|

050518 2071265 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 730.
|
|

050518 2162265 viewsBing Siding. Side view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2172265 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2194265 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 504, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2204265 viewsBing Siding, view of hand brake detail and original markings on ballast waggon 532.
|
|

051001 5720265 viewsBoodarie, the Steel Train or rail recovery and transport train flat waggon #27, third lead off waggon, 6205, built by Comeng WA in February 1977 under order no. 07-M-282 RY.
|
|

051001 5727265 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

060429 3752265 viewsFlash Butt yard, Pony re-laying waggon 6702 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.
|
|

060501 3868265 viewsTabba Siding, ballast plough waggon converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
|
|

050412 0809265 viewsAbydos Siding backtrack, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050421 1615265 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this unit was later stickered as RG 2, side view of the second grinding module. 21st April 2005.
|
|

050518 2206265 viewsBing Siding, a Gemco sleeper inserter track machine attached to a BHB type crane painted in BHP blue await another work day. 18th May 2005.
|
|

080621 2715265 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train as waggon #7.
|
|

080621 2731265 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, close up of bogie and detail of A end.
|
|
18829 files on 942 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
576 |  |
 |
 |
 |
 |
 |
 |
|