Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
070526_9097.jpg
070526 9097321 viewsParkeston, Pacific National RZAY type crew accommodation coach RZAY 944 on train 6PM6 originally built by Comeng NSW in 1969 as a stainless steel air conditioned first class roomette sleeping car, renumbered to 944 for Indian Pacific service, sold to National Rail Corporation in 1997 and converted to a crew coach.
070531_9618.jpg
070531 9618321 viewsParkeston, Pacific National RZBY type crew accommodation car RZBY 208 on train 3MP4, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 208 in 1969, sold to National Rail and converted to crew car in 1997.
160530_9107.jpg
160530 9107321 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, PBHY type covered van PBHY 0019 Greater Freighter, one of thirty five units built by Gemco WA in 2005 without the Greater Freighter signage but with Big W We Sell For Less logo.
161111_2518.jpg
161111 2518321 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30011 with sulphuric acid tank CSA 0134, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
161111_2519.jpg
161111 2519321 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30089 with sulphuric acid tank CSA 0085, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
161112_3008.jpg
161112 3008321 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1674, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with an original style sulphur container S8W G925 with the load weight of sulphur over the top of the walking man logo, and un-decaled hard-top 25U0 type container BISU 100027.
161116_5557.jpg
161116 5557321 viewsBinduli, empty Shell fuel train 4443, tank waggon ATPF 607, built by Westrail Midland Workshops 1982 for Shell as WJP type, 80.66 kL one compartment one dome, fitted with type F InterLock couplers.
050518_2079.jpg
050518 2079321 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 744.
050518_2204.jpg
050518 2204321 viewsBing Siding, view of hand brake detail and original markings on ballast waggon 532.
051001_5715.jpg
051001 5715321 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #25, 6014, a Comeng WA built flat waggon from September 1971.
050315_0242.jpg
050315 0242321 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0010 and others in the BHP blue and white livery.
071202_1230.jpg
071202 1230321 viewsTurner Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity.
050801_4745.jpg
050801 4745321 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
050917_5516.jpg
050917 5516321 viewsCoon Siding, view of the tamper driving and operators cabin locations on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
060429_3767.jpg
060429 3767321 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc with a Barclay Mowlem id number BM57. 29th April 2006.
060429_3772.jpg
060429 3772321 viewsBing Siding, switch tamper SW 02 hurries into Nelson Point, a Plasser Australia Unimat S4 model. 29th April 2006.
060501_3910.jpg
060501 3910321 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
080621_2724.jpg
080621 2724321 viewsTabba South, view from rear of new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
110208_9429.jpg
110208 9429321 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
110619_1881.jpg
110619 1881321 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #11, 6210, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
19085 files on 955 page(s) 577

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional