Most viewed |

150523 8201368 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0035, one of a second batch delivered in 2015 with safety slogan 'Take time to work safely'.
|
|

150523 8218368 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0021, class leader of a batch of ten built in 2014.
|
|

150619 9101368 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0713 loaded with fines for sheeting, A end and bogie detail.
|
|

030403 165451368 viewsRed Hill, a Clyde Engineering built EMD JT46C model AN class unit AN 6 serial 93-1302 on an Adelaide and then Melbourne bound service depart following a crib break for the driver. 3rd April 2003.
|
|

170729 0172368 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
|
|

170728 09690368 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

171121 0971368 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.
|
|

241-06368 viewsNelson Point, Goninan GE rebuild C36-7M units 5506 serial 4839-01 / 87-071 and 5510 serial 4839-07 / 87-075 are in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This view from the radiator of 5506 looking at 5510 shows the difference in the Dash 7 radiator on 5506 and the Dash 8 radiator fitted to 5510 following collision repairs. June 2002.
|
|

241-14368 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood doors open, the Dash 8 radiator frame fitted to it following collision repairs is also evident. June 2002.
|
|

190107 0562368 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00021 built by CSR Yangtze Co China serial 2014/382-21 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1566368 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00112 built by CSR Yangtze Co China serial 2014/382-112 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1603368 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00233 built by CSR Yangtze Co China serial 2014/382-233 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

247-35368 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

249-04368 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

251-05368 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5513 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from 1970 AE Goodwin built ALCo C636 with serial number G6012-2 and road number 5453 and assigned new serial number 4839-02 / 88-078. It was delivered in Mt Newman Mining orange and was named Kalgan. 22nd April 2000.
|
|

254-11368 viewsGreen Tank Pool, August 2001. Geodata location here.
|
|

245-09368 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 851 AE Goodwin ALCo model DL531 serial 84137 which has been on the Eyre Peninsula Division since being built in April 1962, stabled motive power over the weekend downtime. 6th April 2003.
|
|

245-15368 viewsWudinna, empty grain train shunts over Gooch Terrace as it takes a rake of waggons into the grain siding, former Australian National locomotive AE Goodwin ALCo model DL531 830 class units 851 serial 84137 has been on the Eyre Peninsula since delivered in 1962. 7th April 2003.
|
|

190129 4345368 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00222 built by CSR Yangtze Co China serial 2014/382-222 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4468368 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7745 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
585 |  |
 |
 |
 |
 |
 |
 |
|