Most viewed |

050625 3815264 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, two Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
|
|

060429 3767264 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc with a Barclay Mowlem id number BM57. 29th April 2006.
|
|

060501 3909264 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

100717 0658264 viewsFlash Butt yard, new rail stock carrier waggon 6042, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

100717 0667264 viewsFlash Butt yard, new rail stock carrier waggon 6039, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

100717 0693264 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

241-15264 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood doors open. June 2002.
|
|

190107 0642264 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00032 built by CSR Yangtze Co China serial 2014/382-32 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1649264 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00016 built by CSR Yangtze Co China serial 2014/382-16 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1655264 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00089 built by CSR Yangtze Co China serial 2014/382-89 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1667264 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00193 built by CSR Yangtze Co China serial 2014/382-193 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-14264 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080304 2209264 viewsThomas Yard, down the rail welding end, side view of slave waggon 1583, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

248-19264 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On N2 is a radiator view of AE Goodwin built ALCo M636 unit 9412 serial G-6060-3 from December 1971 and originally numbered 262.003 during construction and then 1712. Behind it on N3 is the cab of 9416 also an AE Goodwin built ALCo M636 serial G-6046-16 from January 1973 and originally numbered 1716. Approximate location. 24th April 2004.
|
|

249-17264 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
|
|

251-15264 viewsNelson Point, the South Yard 'prep shed' located on the dumper exit roads 102, 103 and, 104. This facility was used to service and fuel locomotives while their respective waggon rakes were being tipped through the car dumpers. 22nd April 2000.
|
|

251-16264 viewsNelson Point, the South Yard 'prep shed' located on the dumper exit roads 102, 103 and, 104. Goninan GE rebuild unit 5656 a CM40-8M unit with serial number 8412-01 / 94-147 sits on shed with a sister units. This facility was used to service and fuel locomotives while their respective waggon rakes were being tipped through the car dumpers. 22nd April 2000.
|
|

210321 9302264 viewsBoodarie on the 5 km curve loaded FMG ore waggon pair 5745 and 6746 were built by CSR Yangtze with a prototype pressed lower panels. This pair is the same as 3005 - 4006. 21st March 2021.
|
|

256-16264 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

267-17264 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
|
|
18834 files on 942 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
587 |  |
 |
 |
 |
 |
 |
 |
|