Most viewed |

190107 0552409 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00297 built by CSR Yangtze Co China serial 2014/382-297 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0600409 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00291 built by CSR Yangtze Co China serial 2014/382-291 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0618409 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00208 built by CSR Yangtze Co China serial 2014/382-208 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1594409 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00176 built by CSR Yangtze Co China serial 2014/382-176 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-05409 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

246-36409 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|

247-14409 viewsCape Lambert overview of the railway workshops buildings and service shops for surface mining equipment. Approximate location of photo is here. 22nd May 2002.
|
|

249-27409 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo. Approximate location. 18th December 1999.
|
|

253-20409 viewsNelson Point hard stand area, a delivery of CFCLA lease ballast hopper waggons coded CHRY await entry to service. These waggons were bought over from the USA with code CRDX for CFCL by CFCLA with work and repainting carried out at Gemco WA.
|
|

190129 4249409 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00062 built by CSR Yangtze Co China serial 2014/382-62 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4447409 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8039-1 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

140601 4620409 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8048 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

140601 4648409 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7674 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

267-03409 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
|
|

210407 9863409 viewsParkeston, 2MP5 intermodal train, RRRY 7017, platform with Sea2Rail 40' 4EG1 type container Austrans AUSU 408292. The RRRY type five pack bar coupled waggon set is one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005.
|
|

210407 9877409 viewsParkeston, 2MP5 intermodal train, CQWY type well waggon 5055 well 1 with a SCF 4EG1 type container with Austrans AUSU 405026. The CQWY well waggon pairs were built by Bluebird Rail Operations SA in a batch of sixty pairs in 2008 for CFCLA.
|
|

231020 8254409 viewsParkeston, QQYY type 40' container waggon QQYY 57907 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000623 with Cristal decal and CRM 000349 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

125-24408 viewsWallan across Merri Creek, V/Line broad gauge B class Clyde Engineering EMD model ML2 serial ML2-6 still in Victorian Railways livery leads a sleeper discharge train on the up broad gauge line.
|
|

146-27408 viewsBroadford, buffer stop located near station on up Refuge Siding looking south standard gauge line on the left, up platform in the distance.
|
|

134-29408 viewsGlenapp, track view looking south from south end of loop, up departure signals, gangers shed in distance.
|
|
| 19216 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
589 |  |
 |
 |
 |
 |
 |
 |
|