Most viewed |
100609 0999277 viewsMidland, ATPY 602, fuel tanker, built by WAGR Midland Workshops in 1976 as WJP type for BP Oil, capacity of 80500 litres.
|
|
100609 0999877 viewsMidland, ATBY 14593 fuel tanker, one of nine JPB type tankers built for Bain Leasing Pty Ltd by Westrail Midland Workshops in 1981/82 for narrow gauge recoded to JPBA, converted to standard gauge as WJPB. 82000 litre capacity, with a 75000 SF limit.
|
|
100609 1001277 viewsMidland, AQWY 30412 container waggon originally one of one hundred and sixty one built by Tomlinson Steel in 1970 as WFX type, to WQCX in 1989, to WQA in 1995 and WQTY in c1996. Loaded with two 20' containers for Mediterranean Shipping MEDU 196173 type 22G1 and Triton TRIU 155955 a type 2210.
|
|
100609 1001877 viewsMidland, AQWY 30213 container flat waggon built by WAGR Midland Workshops in a batch of forty five WFX type container flats in 1974, recoded to WQCX in 1980. Loaded with two 20' 22G1 type containers Gold GLDU 380590 and Mediterranean Shipping MEDU 170300.
|
|
100611 034777 viewsMidland, APNY 31155, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|
100611 036277 viewsMidland, AZDY 30777, one of about fourteen WBAX vans converted to WQDF type sodium cyanide container waggon, originally built by WAGR Midland Workshops as one of seventy five WV/X type covered vans in 1967-68, converted late 1988/9 to WQDF, then WQDY.
|
|
100611 039077 viewsMidland, AQNY 32195, one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic, running empty on train 5426 up Kalgoorlie Freighter.
|
|
224-2977 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|
224-3277 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|
225-2977 viewsBing siding backtrack, Tomlinson WA built GML ore waggon 8104 loaded with ballast, side view. GeoData.
|
|
226-3077 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.
|
|
229-2077 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|
230-3577 viewsYandi Two balloon loop, mid-train remote unit Goninan GE CM40-8M rebuild 5657 'Fukuyama' serial 8412-02/94-148 is from Comeng ALCo M636 unit 5492. Note the marker lights, silver BHP Australia logo, ALCo Hi-Ad bogie and the sheet metal windscreen protectors to prevent the blown ore pitting the screens. Geodata -22.718338, 119.039909 .
|
|
231-3277 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.
|
|
232-2877 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|
233-0377 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|
233-0677 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|
233-3477 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
|
|
234-3377 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|
235-2677 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the fuel tank and air receiver unit that tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
589 | |
|
|
|
|
|
|
|