Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100731_02356.jpg
100731 0235650 viewsWOB type iron ore waggon WOB 31397 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 321 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, on loaded train 6413 at Binduli Triangle, 31st July 2010.
100731_02421.jpg
100731 0242150 viewsWOE type iron ore waggon WOE 33312 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-017 and fleet number 811 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02507.jpg
100731 0250750 viewsWOE type iron ore waggon WOE 33246 is one of a batch of twenty seven built by Goninan WA between September and October 2002 with serial number and fleet number 745 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02906.jpg
100731 0290650 viewsWOE type iron ore waggon WOE 33307 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-012 and fleet number 806 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_03120.jpg
100731 0312050 viewsWOE type iron ore waggon WOE 30259 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-009 and fleet number 609 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100822_5924.jpg
100822 592450 viewsWOE type iron ore waggon WOE 33255 is one of a batch of twenty seven built by Goninan WA between September and October 2002 with serial number 950103-022 and fleet number 754 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_5946.jpg
100822 594650 viewsWOE type iron ore waggon WOE 30290 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-040 and fleet number 632 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_5975.jpg
100822 597550 viewsWOE type iron ore waggon WOE 33267 is one of a batch of thirty five built by Goninan WA between January and April 2005 with serial number 950104-007 and fleet number 766 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6014.jpg
100822 601450 viewsWOE type iron ore waggon WOE 31065 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-055 and fleet number 651 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6252.jpg
100822 625250 viewsWOE type iron ore waggon WOE 33525 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-065 and fleet number 9038 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6273.jpg
100822 627350 viewsWOD type iron ore waggon WOD 31450 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-022 and fleet number 513 for Koolyanobbing iron ore operations with a 75 ton capacity for Portman Mining to cart their Koolyanobbing iron ore to Esperance, now with PORTMAN painted out, on empty train 1416 at Hampton, 22nd August 2010.
100822_6309.jpg
100822 630950 viewsWOE type iron ore waggon WOE 33260 is one of a batch of twenty seven built by Goninan WA between September and October 2002 with serial number 950103-027 and fleet number 759 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
060111_2285.jpg
060111 228550 viewsMurdinga, rounding the curve before entering the station environs empty grain train running north behind ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004. 11th January 2006.
060111_2298.jpg
060111 229850 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
060111_2302.jpg
060111 230250 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo as they pass the 147 km post. 11th January 2006.
060111_2334.jpg
060111 233450 viewsWarramboo, located at the 190.2 km and opened with the line in May 1913, with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 stands on the mainline as loading on the grain siding has started. 11th January 2006.
060111_2350.jpg
060111 235050 viewsKyancutta, empty grain waggons being shunted, SAR Islington Workshops built HAN type bogie wheat waggons HAN 34 with ANR logo, while HAN 15 still has the SAR logo. 11th January 2006.
060113_2486.jpg
060113 248650 viewsKevin, ARG 1600 class narrow gauge loco 1604 a Clyde Engineering built EMD model JL22C serial 71-731, originally built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981 arrives with empty gypsum train 6DD3. 13th January 2006.
060113_2527.jpg
060113 252750 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
060113_2531.jpg
060113 253150 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
16099 files on 805 page(s) 592

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional