Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
110411_09992.jpg
110411 0999277 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
110411_10004.jpg
110411 1000477 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
110411_10033.jpg
110411 1003377 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
130720_1448.jpg
130720 144877 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
130720_1563.jpg
130720 156377 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 717, modified from a similar CHQY class with the end framing removed.
150523_8207.jpg
150523 820777 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
150619_9101.jpg
150619 910177 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0713 loaded with fines for sheeting, A end and bogie detail.
150729_9457.jpg
150729 945777 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0235, loaded with ballast.
160128_00334.jpg
160128 0033477 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0025, one of a batch of ten built in 2014.
070908_0596.jpg
070908 059677 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
241-36.jpg
241-3677 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
243-07.jpg
243-0777 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
080124_1623.jpg
080124 162377 viewsClose up view of the F type Interlock coupler and knuckle. 24th January 2008.
110620_2275.jpg
110620 227577 viewsChapman, FMG TK type fuel tank waggon TK 06 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
210322_9567.jpg
210322 956777 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 126 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
245-08.jpg
245-0877 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 851 AE Goodwin ALCo model DL531 serial 84137 which has been on the Eyre Peninsula Division since being built in April 1962, stabled motive power over the weekend downtime. 6th April 2003.
245-17.jpg
245-1777 viewsWudinna, empty grain train shunts back into the grain siding with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
140601_4449.jpg
140601 444977 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8028-2 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
140601_4455.jpg
140601 445577 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8054-2 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
140601_4464.jpg
140601 446477 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7762 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
16480 files on 824 page(s) 595

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional