Most viewed |

171121 096393 viewsBarker Siding, Loram rail grinder MPC 2, grinder cart. 21st November 2017.
|
|

171121 096593 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 02, built in China by CSR at the Yangtze Rolling Stock Company in 2010 on the south end of a ballast rake. 21st November 2017.
|
|

171121 096693 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.
|
|

241-1493 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood doors open, the Dash 8 radiator frame fitted to it following collision repairs is also evident. June 2002.
|
|

241-2393 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side cab view. June 2002.
|
|

241-3093 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
|
|

080304 217293 viewsThomas Yard, down the rail welding end, side view of control waggon 2242, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 218593 viewsThomas Yard, down the rail welding end, side view of control waggon 2186, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 218993 viewsThomas Yard, down the rail welding end, side view of control waggon 2328, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 219393 viewsThomas Yard, looking north, long rake of waggons being run up and down the mainline to keep the wheels turning. 4th March 2008.
|
|

210510 113193 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTB type end rail waggon RTB 022 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

254-1193 viewsGreen Tank Pool, August 2001. Geodata location here.
|
|

254-2893 viewsEnroute to the former Stannum Mine, bogged in a tributary of the Yule River, looking west. GeoData location here. September 2001. September 2001.
|
|

245-0493 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 865 AE Goodwin ALCo model DL531 serial 84711. 6th April 2003.
|
|

245-0893 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 851 AE Goodwin ALCo model DL531 serial 84137 which has been on the Eyre Peninsula Division since being built in April 1962, stabled motive power over the weekend downtime. 6th April 2003.
|
|

245-1893 viewsWudinna, empty grain train shunts back into the grain siding with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
|
|

140601 445493 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8054-1 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

140601 445893 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7648 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 446193 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7668 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 446593 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7636 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|
16827 files on 842 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
603 |  |
 |
 |
 |
 |
 |
 |
|