Most viewed |

0017 Comeng WA 110411 10011404 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0017 from 1974-5, one of six such tank waggons.
|
|

0013 Comeng WA 150314 7739404 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

0003 Comeng NSW 150729 9455404 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
|
|

030404 082806404 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
|
|

241-04404 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

241-12404 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|

190107 0585404 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00240 built by CSR Yangtze Co China serial 2014/382-240 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1588404 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00095 built by CSR Yangtze Co China serial 2014/382-95 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-11404 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080116 1377404 viewsChapman Siding, FMG slave waggon 1187, built by CSR at their Zhuzhou Rolling Stock Works in China during August 2007, view of the builders plate and bracket for RFID tag. 16th January 2008.
|
|

080304 2171404 viewsThomas Yard, down the rail welding end, side view of slave waggon 1241, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2183404 viewsThomas Yard, down the rail welding end, side view of control waggon 2338, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-06404 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

247-30404 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
|
|

249-09404 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

252-12404 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 01 is behind the locomotive. Location is roughly here. 24th November 2001.
|
|

210322 9584404 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
|
|

245-08404 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 851 AE Goodwin ALCo model DL531 serial 84137 which has been on the Eyre Peninsula Division since being built in April 1962, stabled motive power over the weekend downtime. 6th April 2003.
|
|

245-09404 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 851 AE Goodwin ALCo model DL531 serial 84137 which has been on the Eyre Peninsula Division since being built in April 1962, stabled motive power over the weekend downtime. 6th April 2003.
|
|

190129 4246404 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00030 built by CSR Yangtze Co China serial 2014/382-30 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19215 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
606 |  |
 |
 |
 |
 |
 |
 |
|