Most viewed |

CHQY 730 040814 092011402 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, view of code board.
|
|

0513 Magor USA 050412 0735402 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
|
|

0520 Magor USA 050412 0756402 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 520.
|
|

0516 Magor USA 050518 2193402 viewsBing Siding. Side view of 1963 built Magor USA waggon 516, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0536 Magor USA 050518 2202402 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

6208 Comeng WA 051001 5712402 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, builders plate, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|

050724 4214402 viewsNelson Point yard, flat waggon #6? in service on the Pony re-laying train as a transport waggon for a gantry car as pictured. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
|
|

060501 3921402 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, second grinding module. 1st May 2006.
|
|

0007 Comeng NSW 110411 10007402 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0007 one of six such tank waggons built in 1970-71.
|
|

6207 Comeng WA 110619 1884402 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #14, 6207, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

0016 Comeng WA 150314 7743402 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

0710 CNR - QRRS China 150619 9082402 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
|
|

030404 082825402 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
|
|

170510 8293402 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

190107 0530402 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
|
|

190107 0551402 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00102 built by CSR Yangtze Co China serial 2014/382-102 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080304 2172402 viewsThomas Yard, down the rail welding end, side view of control waggon 2242, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2198402 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1535 slave and 2536 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

250-16402 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
|
|

255-20402 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|
| 19215 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
615 |  |
 |
 |
 |
 |
 |
 |
|