Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100611_0342.jpg
100611 034263 viewsMidland, AOXY 33051 open waggon, converted to carry nickel matte bulk bags similar to the WGL type traffic, AOXY 33051 was originally built by WAGR Midland Workshop between 1966-67 as one of a batch of one hundred, was recoded to WGS for superphosphate traffic 1969-70.
100611_0355.jpg
100611 035563 viewsMidland, APNY 31151, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
100611_0358.jpg
100611 035863 viewsMidland, AQWY 30435 container waggon originally one of one hundred and sixty one built by Tomlinson Steel in 1970 as WFX type, to WQCX in 1980. Loaded with two roll top containers, COP 0001 and COR 5895 and a 20' 22G1 box.
226-27.jpg
226-2763 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
229-19.jpg
229-1963 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-21.jpg
229-2163 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
230-22.jpg
230-2263 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
233-26.jpg
233-2663 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.
233-34.jpg
233-3463 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
234-25.jpg
234-2563 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking from 5658 back to the ore stockpile at the loadout. Circa 1998.
235-25.jpg
235-2563 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 on the left coupled to Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128 on the right, note the differences in the two locos as 5653 is a later rebuild with marker lights and the marigold logo while 5639 has no marker lights, plain logo and a plough fitted to the No.2 end.
236-23.jpg
236-2363 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 and 6077 beside it.
160523_3341.jpg
160523 334163 viewsWest Kalgoorlie, AQHY 30110 with CSA 0118, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0118 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160523_3587.jpg
160523 358763 viewsBinduli, nickel concentrate train 2438, WNB type pneumatic discharge nickel concentrate waggon WNB 543, one of six built by Bluebird Rail Services SA in 2010 for BHP Billiton.
160525_4810.jpg
160525 481063 viewsWest Kalgoorlie, AQHY 30006 with sulphuric acid tank CSA 0131, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of empty acid train 4405 departing in the yard. CSA 0131 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160525_4831.jpg
160525 483163 viewsWest Kalgoorlie, ATHY 522 fuel tanker, one of two built by Comeng NSW in 1971 for Caltex as WJH type. With a capacity of 103000 litres but a safe full level of on 72000 litres.
160525_4841.jpg
160525 484163 viewsWest Kalgoorlie, ATPF 574 fuel tanker, one of nine built by WAGR Midland Workshops in 1974 for Shell as type WJP, 80.66 kL one compartment one dome, original code and fleet no. TR709, with a capacity now of 80000 litres.
160523_3600.jpg
160523 360063 viewsWest Kalgoorlie, AQHY 30049 with sulphuric acid tank CSA 0104, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of loaded acid train 2406 arriving back in the yard. CSA 0104 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160524_3755.jpg
160524 375563 viewsWest Kalgoorlie, 2PM6 intermodal train, RRQY 8313 platform 1 of 5-pack articulated skel waggon, one of forty one sets built by Qiqihar Rollingstock Works China in 2006 loaded with a Toll 48' box TSPD 48350.
160524_3765.jpg
160524 376563 viewsWest Kalgoorlie, 2PM6 intermodal train, RRAY 7232 platform 2 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, with a 40' Sadleirs curtainsider RCS 4038.
16404 files on 821 page(s) 618

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional