Most viewed |
108-20250 viewsTatura yard derrick crane.
|
|
126-22250 viewsBroadford Loop, V/Line G class G 518 Clyde Engineering EMD model JT26C-2SS serial 85-1231, loco failure, up standard gauge pass Melbourne Express, loco cut off, passengers detrained.
|
|
146-12250 viewsSeymour, rationalised broad gauge yard view with stabled Wodonga goods 9303 behind V/Line X class X 47 Clyde Engineering EMD model G26C serial 75-794, cab front.
|
|
153-3-12250 viewsMininera, the peace is shattered as V/Line broad gauge goods to Adelaide train 9169 is lead by C class C 507 Clyde Engineering EMD model GT26C serial 76-830, C 502 serial 76-825 and an S class, bit out of focus as it caught the photographer by surprise.
|
|
135-11250 views2400 class QR locos 2503 and 2500 with a loaded coal train, near Ipswich.
|
|
114-25250 viewsBenalla signal gantry, semaphore signal post 28 pulled off for up Albury passenger train, looking north, yard still fully interlocked and signalled, disc signal post 22 facing away from camera, post 27 facing camera, signal gantry features from left, disc post 23, 24, semaphore post 25, 26 and 28.
|
|
186-12250 viewsMidland, standard gauge two car Prospector service to Kalgoorlie, train 4085 with motorised driving car WCA class 902 and driving trailer WCE class 921, these cars were built by Comeng NSW in 1971.
|
|
192-13250 viewsJunee, NSWSRA standard gauge locomotive depot, class leader of the NSWGR 45 class 4501 an ALCo RSD-20 or DL-541 built by AE Goodwin in 1962 with serial 84143.
|
|
196-03250 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|
193-12250 viewsMoodlu Quarry line curving around to the left with catch point and disc, the line on the right is curving towards Moodlu station site.
|
|
200-11250 viewsMoorine Rock, Australian National AN class AN 6 a Clyde Engineering built EMD model JT46C serial 93-1302, cab side view sits on the mainline with a Perth bound freight, 1500 hrs 22nd June 1997.
|
|
203-34250 viewsYampire Gorge, remains of asbestos mining, chute to move ore down between levels.
|
|
216-09250 viewsDry Creek Motive Power Centre, Australian National trio of standard gauge light engines wearing the AN livery with CL class CL 17 'William McMahon' Clyde Engineering EMD model AT26C serial 71-757 leading a 700 class and a BL class.
|
|
217-08250 viewsKeswick Terminal, logo on the side of passenger coach as part of 'The Ghan' consist from Adelaide to Alice Springs.
|
|
030406 081444250 viewsMurdinga, looking north from the north end, 6th April 2003.
|
|
030411 105119250 viewsKimba Grain Bunker site, overview of arrangement. Former Cortlinye shelter placed for crew, lighting tower for night time operation and the yellow auger goes to the over rail loadout bin.
|
|
030414 154434250 viewsPenong station name board on shelter shed. , last train in March 1997.
|
|
150505 7979250 viewsFMG Solomon Line, waggon 4006, tare weight of 22 tonnes, built in 2009 by CSR Yangtze Rolling Stock Co. Ltd, loaded with fines ore. Geodata: -22.0187350 118.5850917 .
|
|
150523 8201250 viewsNelson Point Yard, parked beside the Locomotive Service Shop, BHP Billiton diesel fuel tank waggon 0035 with safety slogan 'Take time to work safety', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|
WTT Nor East 1985-04-14250 viewsWorking Time-Table North-Eastern Region 14th April 1985, complete 121 page PDF download, 8.2 MB.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
65 | |
|
|
|
|
|
|
|