Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050414_0946.jpg
050414 0946248 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the generator and driving module. 14th April 2005.
050625_3813.jpg
050625 3813248 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, three Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
050801_4751.jpg
050801 4751248 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
080621_2716.jpg
080621 2716248 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6104 in service with the rail recovery and transport train as waggon #6.
080621_2723.jpg
080621 2723248 viewsTabba South, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
100717_0672.jpg
100717 0672248 viewsFlash Butt yard, new rail stock carrier waggon 6030, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0681.jpg
100717 0681248 viewsFlash Butt yard, new rail stock carrier waggon 6033, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09979.jpg
110411 09979248 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
110411_10005.jpg
110411 10005248 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
110619_1884.jpg
110619 1884248 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #14, 6207, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
130720_1437.jpg
130720 1437248 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed.
150619_9080.jpg
150619 9080248 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, A end and bogie detail.
150619_9081.jpg
150619 9081248 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
160128_00332.jpg
160128 00332248 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0026, one of a batch of ten built in 2014.
241-28.jpg
241-28248 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
190109_1657.jpg
190109 1657248 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00302 built by CSR Yangtze Co China serial 2014/382-302 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080304_2180.jpg
080304 2180248 viewsThomas Yard, down the rail welding end, side view of slave waggon 1341, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2197.jpg
080304 2197248 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1059 slave and 2060 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-32.jpg
246-32248 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 136 which is from the original order for 285 waggons from Nippon Sharyo Japan. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
247-22.jpg
247-22248 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
18783 files on 940 page(s) 657

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional